Sign in

66TH AVE E, Puyallup, WA 98371

On MLS · $175,000 · 41 days · Redfin ↗

Lots near here →

1.6 ac · 96% outside sensitive areas

68,036 sf · 1.6 ac
Width ≈ 223 ft · Depth ≈ 333 ft
Outside sensitive areas about 65,200 sf
Width and depth are estimated.
County
Pierce County
Parcel ID
6022060210
Assessed land value
$110,300
Assessed building value
$0
Legal
Section 30 Township 20 Range 04 Quarter 44 POMROY PARK: POMROY PARK SE OF SE 30-20-04E TR B FUTURE DEVELOPMENT & BUFFER AREA RETAINED BY OWNER APPROX 68,038 SQ FT EASE OF REC OUT OF 4-020 & 8-001 SEG I0605 MD 3/18/97MD

Values are from the county assessor.

Jurisdiction
Pierce County
Zone
RSep · Rural Separator →

Your lot

Lot area
68,036 sf
Net area
65,197 sf (lot area minus wetland, flood, steep slope)
Frontage
0 ft
Lot width
≈ 223 ft (estimated)
Lot depth
≈ 333 ft (estimated)

✔ You can build (by right)

1 unit
Detached Single-Family HousingPCC Table 18A.27.020
⚠ Needs to check:
  • Lot area 68,036 sf, one of these:
    ✗At least 108,900 sfPCC Table 18A.15.020-2
    ✓No minimum, if the lot was legally createdPCC 18A.15.010(B)
  • Lot area 68,036 sf, one of these:
    ✓At least 18,770 sf (depends on the project), unless the lot was legally createdPCC Table 18A.15.020-2; PCC 18A.15.020(A)(4); 18A.65.050(A)(1); Table 18A.65.050 A.
    ✓At least 25,921 sf (depends on the project), unless the lot was legally createdPCC Table 18A.15.020-2; PCC 18A.15.020(A)(4); 18A.65.050(A)(1); Table 18A.65.050 A.
    ✓No minimum, if the lot was legally createdPCC 18A.15.010(B)
    ✗At least 108,900 sf (1 unit at 0.2/acre), unless the lot was legally createdPCC Table 18A.15.020-2; PCC 18A.15.020(A)(4)
ADU
ADU with Detached Single-Family HousingPCC 18A.37.120(A)(1); 18A.37.120(A)(3)
⚠ Needs to check:
  • Lot area 68,036 sf, one of these:
    ✗At least 108,900 sfPCC Table 18A.15.020-2
    ✓No minimum, if the lot was legally createdPCC 18A.15.010(B)
  • Lot area 68,036 sf, one of these:
    ✓At least 18,770 sf (depends on the project), unless the lot was legally createdPCC Table 18A.15.020-2; PCC 18A.15.020(A)(4); 18A.65.050(A)(1); Table 18A.65.050 A.
    ✓At least 25,921 sf (depends on the project), unless the lot was legally createdPCC Table 18A.15.020-2; PCC 18A.15.020(A)(4); 18A.65.050(A)(1); Table 18A.65.050 A.
    ✓No minimum, if the lot was legally createdPCC 18A.15.010(B)
    ✗At least 108,900 sf (1 unit at 0.2/acre), unless the lot was legally createdPCC Table 18A.15.020-2; PCC 18A.15.020(A)(4)
Only if: Whether the project uses the 18A.65 bonus housing units, and for which kind of low-income units is nonePCC 18A.65.050(A)(2)

Dividing the lot

Subdivision
✗ Cannot be divided into 2 lotsPCC 18F.40.020
✗ New lot area 34,018 sf < 43,560 sf required (short 9,542 sf)PCC 18A.15.030(B)(3)
✗ Road frontage 0 ft is too short for 2 lots: each new lot needs 60 ft on the roadPCC Table 18A.15.020-2
Short subdivision
✗ Cannot be divided into 2 lotsPCC 18F.50.040(E)
✗ New lot area 34,018 sf < 43,560 sf required (short 9,542 sf)PCC 18A.15.030(B)(3)
✗ Road frontage 0 ft is too short for 2 lots: each new lot needs 60 ft on the roadPCC Table 18A.15.020-2
Large lot division
✗ Cannot be divided into 2 lotsPCC 18F.50.040(E)
✗ New lot area 34,018 sf < 217,800 sf required (short 183,782 sf)PCC 18A.15.030(B)(3)
✗ Road frontage 0 ft is too short for 2 lots: each new lot needs 60 ft on the roadPCC Table 18A.15.020-2

Counted: only lots that face an existing road.
Not checked: lot shape, and whether the lot was divided in the last 5 years.

Frontage (lot edge within 50 ft of a road)

No road within 50 ft faces the lot.

Outside sensitive areas about 65,200 sf (wetland, flood, mapped stream buffer and slope 40% or more are taken off)
The largest rectangle that fits outside the sensitive areas. Setbacks and review areas are not taken off.
Easy to build: standard foundation, little grading.
Some extra cost: stepped foundation, steeper driveway.
Costly: retaining walls and an engineered foundation, often a geotech report.
Very steep. It is a sensitive area.
Wetland, flood, mapped stream buffer and slope 40% or more. The slope under them is shown, because a site study can move these lines.
Estimated from public maps. A site study and the permit review set the final area.

Source: USGS 3DEP bare-earth elevation (lidar), slope on a 3 m grid.
Check it on the WA DNR Lidar Portal ↗.

1. Soil on the lot

Foundation very limited · Rain water very limited · Septic very limited

2. What it means for a house

Foundation
USDA soil rating for a house foundation · Soil A, 100% of the land outside sensitive areas
1
USDA rating
Not limitedSomewhat limitedVery limited

USDA rates every soil on 3 levels, from best to worst.

2
What "very limited" means

The soil has one or more features that are bad for this use. They usually cannot be fixed without major soil work, a special design, or costly building methods. Expect poor performance and high upkeep.

USDA text
"Very limited" indicates that the soil has one or more features that are unfavorable for the specified use. The limitations generally cannot be overcome without major soil reclamation, special design, or expensive installation procedures. Poor performance and high maintenance can be expected.
3
How USDA rates it

The use: A house of 3 stories or less, with no basement. It sits on concrete footings, about 2 ft deep.

The test: USDA checks soil features for this use, like flooding, ground water and slope. Each feature that limits the use gets a score from 0.01 to 1.00. The worst score sets the rating: 1.00 is very limited, a lower score is somewhat limited, no score is not limited.

USDA text
Dwellings are single-family houses of three stories or less. For dwellings without basements, the foundation is assumed to consist of spread footings of reinforced concrete built on undisturbed soil at a depth of 2 feet or at the depth of maximum frost penetration, whichever is deeper.
All features and their limits →
4
What USDA found here: 1 limiting feature · worst 1.00 → very limited
  • SlopeNo limitWorst1.00Steep ground makes it hard for heavy machines to work.
    USDA text
    Steep slopes impede trafficability of heavy machinery and reclamation of borrow sites.
Rain water
USDA soil rating for soaking up rain water · Soil A, 100% of the land outside sensitive areas
1
USDA rating
Not limitedSomewhat limitedVery limited

USDA rates every soil on 3 levels, from best to worst.

2
What "very limited" means

The soil has one or more features that are bad for this use. They usually cannot be fixed without major soil work, a special design, or costly building methods. Expect poor performance and high upkeep.

USDA text
"Very limited" indicates that the soil has one or more features that are unfavorable for the specified system. The limitations generally cannot be overcome without major soil reclamation, special design, or expensive installation procedures. Poor performance and high maintenance can be expected.
3
How USDA rates it

The use: A shallow system that lets rain water soak into the ground, like a rain garden, a swale or porous paving. It holds 1 inch of rain, and the water should soak in within 24 to 48 hours.

The test: USDA checks soil features for this use, like flooding, ground water and slope. Each feature that limits the use gets a score from 0.01 to 1.00. The worst score sets the rating: 1.00 is very limited, a lower score is somewhat limited, no score is not limited.

USDA text
Shallow Infiltration Systems are a set of Best Management Practices for stormwater management. These systems include pervious pavement, buffer strips, filter strips, and vegetated swales. … The fundamental function of these systems is to hold the runoff generated from an area during a one inch rainfall event. … The water should infiltrate into the surrounding soil in 24 to 48 hours.
All features and their limits →
4
What USDA found here: 3 limiting features · worst 1.00 → very limited
  • SlopeNo limitWorst1.00Sloping ground is harder for machines and needs a changed design. Added water can make the slope slide.
    USDA text
    Soils that are sloping are limited in terms of the stormwater management systems that can be installed. Sloping soils are more difficult to for equipment usage. excessive slope may also be a trigger for mass movement when additional water is added to a part of the landscape.
  • Vegetation establishmentNo limitWorst0.39After digging, plants are harder to grow back. Better topsoil or soil amendments may be needed.
    USDA text
    Material rated fair can be vegetated and stabilized by modifying one or more properties. Topdressing with better material or applications of soil amendments may be necessary for satisfactory performance.
  • Adsorptive capacityNo limitWorst0.18The soil under the system can hold back only a little of the harmful material in rain water. This reason can make the rating somewhat limited, never very limited.
    USDA text
    Soils having low adsorption lack the ability to attenuate potentially harmful material.
Septic
USDA soil rating for a septic drainfield · Soil A, 100% of the land outside sensitive areas
1
USDA rating
Not limitedSomewhat limitedVery limited

USDA rates every soil on 3 levels, from best to worst.

2
What "very limited" means

The soil has one or more features that are bad for this use. They usually cannot be fixed without major soil work, a special design, or costly building methods. Expect poor performance and high upkeep.

USDA text
"Very limited" indicates that the soil has one or more features that are unfavorable for the specified use. The limitations generally cannot be overcome without major soil reclamation, special design, or expensive installation procedures. Poor performance and high maintenance can be expected.
3
How USDA rates it

The use: A standard septic drainfield: pipes that spread water from the septic tank into the soil. Only the soil 2 to 5 ft deep is rated.

The test: USDA checks soil features for this use, like flooding, ground water and slope. Each feature that limits the use gets a score from 0.01 to 1.00. The worst score sets the rating: 1.00 is very limited, a lower score is somewhat limited, no score is not limited.

USDA text
Septic tank absorption fields are areas in which effluent from a septic tank is distributed into the soil through subsurface tiles or perforated pipe. Only that part of the soil between depths of 24 and 60 inches is evaluated.
All features and their limits →
4
What USDA found here: 2 limiting features · worst 1.00 → very limited
  • Seepage, bottom layerNo limitWorst1.00The bottom layer drains fast. Septic water can seep away before it is clean.
    USDA text
    The soil's bottom layer Ksat governs the leaching and seepage potential of the soil. When this rate is high, transmission of fluids through the soil and underlying materials is unimpeded and leaching and seepage may become environmental, health, and performance concern.
  • SlopeNo limitWorst1.00Steep ground makes it hard for machines to work. Septic water can seep out on the slope below.
    USDA text
    Steep slopes impede trafficability of heavy machinery and reclamation of borrow sites. Excessive slope may cause lateral seepage and surfacing of the effluent in down-slope areas.

Source: USDA soil survey (SSURGO). It maps soil at about 1 inch = 1/4 mile, so a soil line can be off by 100 ft or more. For screening only.
USDA: "Onsite investigation may be needed to validate these interpretations and to confirm the identity of the soil on a given site."
Not checked: liquefaction.

Sensitive areas
Needs a study
On the Pierce County mapmap ↗
On the Puyallup mapmap ↗
On the DNR map: fish stream (type F), not checked in the fieldmap ↗
Land near a mapped stream. The city or county may ask for a stream study before a permit.
On the Pierce County mapmap ↗
On the Puyallup mapmap ↗
Land near a mapped wetland. Pierce County may ask for a wetland study before a permit.
On the Pierce County mapmap ↗
Land in or near a mapped landslide. The city or county may ask for a geotech report before a permit.
On the Pierce County mapmap ↗
Land in a mapped fish and wildlife habitat. The city or county may ask for a habitat study before a permit.
On the Pierce County mapmap ↗
On the Puyallup mapmap ↗

Estimated from public maps. A site study and the permit review set the final area.
Source: city and county wetland maps and review areas, city and county stream maps and review areas, city and county habitat maps, city and county landslide maps, NWI wetlands, DNR streams, WDFW priority habitats, DNR landslides, FEMA 100-year flood zones, USGS 3DEP slope, USDA soil survey.
The map links show each public layer as it is. They can show rows we leave out, like filled wetlands or buffers.
Not checked: wetlands off the lot, stream buffers that the city or county does not map, habitats that WDFW does not show at their true place, landslides outside the areas that the DNR has studied. Not every city or county maps a review area, so a lot with none can still be in a wetland buffer.

Sewer

Inside UGA
no
Nearest public main
not on our maps (within 500 ft)

Source: WA Urban Growth Areas; city, county and sewer district sewer maps.
The sewer maps have gaps. A main can be there but not on the map. The sewer district decides.

Water

Water system
SUMMIT WATER & SUPPLY CO
Phone
(253) 537-7781

Source: WA Department of Health service areas. The area shows who serves the lot, not where the pipe is. Ask the water system for the distance to the main and the cost.