13724 96TH AVE E, Puyallup, WA 98373
On MLS · $225,000 · 221 days · Redfin ↗
Lots near here →14,405 sf · 100% outside sensitive areas
- County
- Pierce County
- Parcel ID
- 6026060120
- Assessed land value
- $153,500
- Assessed building value
- $0
- Legal
- Section 16 Township 19 Range 04 Quarter 42 WOHLFORD ADD L 12 TOG/W 1/20TH UNDIV INT IN TR A & C EASE OF REC OUT OF 04-19-16-4-067 & 4-068 SEG 2013-0277 DX2/12/13DX
Values are from the county assessor.
- Jurisdiction
- Pierce County
- Zone
- RR · Residential Resource →
Your lot
- Lot area
- 14,405 sf
- Net area
- 14,405 sf (lot area minus wetland, flood, steep slope)
- Frontage
- 18 ft
- Lot width
- ≈ 115 ft (estimated)
- Lot depth
- ≈ 83 ft (estimated)
✔ You can build (by right)
| 1 unit | Mobile HomePCC Table 18A.17.010; Table 18A.22.010; Table 18A.24.010; Table 18A.27.010; Table 18A.28.010; Table 18A.29.010 Detached Single-Family HousingPCC Table 18A.17.010; Table 18A.22.010; Table 18A.24.010; Table 18A.27.010; Table 18A.28.010; Table 18A.29.010 |
| ADU | ADU with Detached Single-Family HousingPCC 18A.37.120(A)(1); 18A.37.120(A)(3) Only if: Whether the project uses the 18A.65 bonus housing units, and for which kind of low-income units is nonePCC 18A.65.050(A)(2) |
✗ Your lot does not meet the zoning requirements
| 2 units | DuplexesPCC Table 18A.17.010; Table 18A.22.010; Table 18A.24.010; Table 18A.27.010; Table 18A.28.010; Table 18A.29.010 ✗ Net area 14,405 sf < 16,376 sf required (short 1,971 sf)PCC Table 18A.15.020-1; PCC 18A.15.020(D); 18A.65.050(A)(1); Table 18A.65.050 A.; PCC Table 18A.15.020-1; PCC 18A.15.020(C)(1); 18A.15.020(A)(2); 18A.15.020(A)(4); PCC Table 18A.15.020-1; PCC 18A.15.020(C)(1); 18A.15.020(A)(2); 18A.15.020(A)(4); PCC 18A.15.020(E)(1)(e); PCC Table 18A.15.020-1; PCC 18A.15.020(D); PCC Table 18A.15.020-1; PCC 18A.15.020(D); PCC 18A.15.020(E)(1)(e) |
Dividing the lot
| Subdivision | ✗ Cannot be divided into 2 lotsPCC 18F.40.020 ✗ Net area 14,405 sf < 16,376 sf required (short 1,971 sf)PCC Table 18A.15.020-1; PCC 18A.15.020(D); 18A.65.050(A)(1); Table 18A.65.050 A.; PCC Table 18A.15.020-1; PCC 18A.15.020(C)(1); 18A.15.020(A)(2); 18A.15.020(A)(4); PCC Table 18A.15.020-1; PCC 18A.15.020(C)(1); 18A.15.020(A)(2); 18A.15.020(A)(4); PCC 18A.15.020(E)(1)(e); PCC Table 18A.15.020-1; PCC 18A.15.020(D); PCC Table 18A.15.020-1; PCC 18A.15.020(D); PCC 18A.15.020(E)(1)(e) ✗ Road frontage 18 ft is too short for 2 lots: each new lot needs 50 ft on the roadPCC Table 18A.15.020-1
|
| Short subdivision | ✗ Cannot be divided into 2 lotsPCC 18F.50.040(E) ✗ Net area 14,405 sf < 16,376 sf required (short 1,971 sf)PCC Table 18A.15.020-1; PCC 18A.15.020(D); 18A.65.050(A)(1); Table 18A.65.050 A.; PCC Table 18A.15.020-1; PCC 18A.15.020(C)(1); 18A.15.020(A)(2); 18A.15.020(A)(4); PCC Table 18A.15.020-1; PCC 18A.15.020(C)(1); 18A.15.020(A)(2); 18A.15.020(A)(4); PCC 18A.15.020(E)(1)(e); PCC Table 18A.15.020-1; PCC 18A.15.020(D); PCC Table 18A.15.020-1; PCC 18A.15.020(D); PCC 18A.15.020(E)(1)(e) ✗ Road frontage 18 ft is too short for 2 lots: each new lot needs 50 ft on the roadPCC Table 18A.15.020-1
|
Counted: only lots that face an existing road.
Not checked: lot shape, and whether the lot was divided in the last 5 years.
| (unnamed) | local road | 18 ft | ⚠ A flag lot or fire access often needs 20 ft. |
Source: USGS 3DEP bare-earth elevation (lidar), slope on a 3 m grid.
Check it on the WA DNR Lidar Portal ↗.
1. Soil on the lot
2. What it means for a house
USDA rates every soil on 3 levels, from best to worst.
The soil is fair for this use. The limits can be overcome or made smaller with special planning, design or building. Expect fair performance and some upkeep.
USDA text
"Somewhat limited" indicates that the soil has features that are moderately favorable for the specified use. The limitations can be overcome or minimized by special planning, design, or installation. Fair performance and moderate maintenance can be expected.
The use: A house of 3 stories or less, with no basement. It sits on concrete footings, about 2 ft deep.
The test: USDA checks soil features for this use, like flooding, ground water and slope. Each feature that limits the use gets a score from 0.01 to 1.00. The worst score sets the rating: 1.00 is very limited, a lower score is somewhat limited, no score is not limited.
USDA text
Dwellings are single-family houses of three stories or less. For dwellings without basements, the foundation is assumed to consist of spread footings of reinforced concrete built on undisturbed soil at a depth of 2 feet or at the depth of maximum frost penetration, whichever is deeper.
- Depth to saturated zoneNo limitWorst0.91Ground water is close to the surface. The soil drains slowly and can get soggy in heavy rain.
USDA text
Soils with shallow depth to a water table maybe difficult to reclaim and revegetated. These areas are slow to drain and can become waterlogged and boggy during periods of heavy precipitation.
USDA rates every soil on 3 levels, from best to worst.
The soil has one or more features that are bad for this use. They usually cannot be fixed without major soil work, a special design, or costly building methods. Expect poor performance and high upkeep.
USDA text
"Very limited" indicates that the soil has one or more features that are unfavorable for the specified system. The limitations generally cannot be overcome without major soil reclamation, special design, or expensive installation procedures. Poor performance and high maintenance can be expected.
The use: A shallow system that lets rain water soak into the ground, like a rain garden, a swale or porous paving. It holds 1 inch of rain, and the water should soak in within 24 to 48 hours.
The test: USDA checks soil features for this use, like flooding, ground water and slope. Each feature that limits the use gets a score from 0.01 to 1.00. The worst score sets the rating: 1.00 is very limited, a lower score is somewhat limited, no score is not limited.
USDA text
Shallow Infiltration Systems are a set of Best Management Practices for stormwater management. These systems include pervious pavement, buffer strips, filter strips, and vegetated swales. … The fundamental function of these systems is to hold the runoff generated from an area during a one inch rainfall event. … The water should infiltrate into the surrounding soil in 24 to 48 hours.
- WetnessNo limitWorst1.00Ground water comes close to the surface in the wet season.
USDA text
Soils having a high seasonal water table are limited for shallow infiltration systems.
- Vegetation establishmentNo limitWorst0.37After digging, plants are harder to grow back. Better topsoil or soil amendments may be needed.
USDA text
Material rated fair can be vegetated and stabilized by modifying one or more properties. Topdressing with better material or applications of soil amendments may be necessary for satisfactory performance.
- Adsorptive capacityNo limitWorst0.25The soil under the system can hold back only a little of the harmful material in rain water. This reason can make the rating somewhat limited, never very limited.
USDA text
Soils having low adsorption lack the ability to attenuate potentially harmful material.
Source: USDA soil survey (SSURGO). It maps soil at about 1 inch = 1/4 mile, so a soil line can be off by 100 ft or more. For screening only.
USDA: "Onsite investigation may be needed to validate these interpretations and to confirm the identity of the soil on a given site."
Not checked: septic, liquefaction.
Estimated from public maps. A site study and the permit review set the final area.
Source: city and county wetland maps and review areas, city and county stream maps and review areas, city and county habitat maps, city and county landslide maps, NWI wetlands, DNR streams, WDFW priority habitats, DNR landslides, FEMA 100-year flood zones, USGS 3DEP slope, USDA soil survey.
The map links show each public layer as it is. They can show rows we leave out, like filled wetlands or buffers.
Not checked: wetlands off the lot, stream buffers that the city or county does not map, habitats that WDFW does not show at their true place, landslides outside the areas that the DNR has studied. Not every city or county maps a review area, so a lot with none can still be in a wetland buffer.
Sewer
- Inside UGA
- yes
- Nearest public main
- 321 ft
- Provider
- Pierce County Sewer Division ↗ · (253) 798-4050
Source: WA Urban Growth Areas; city, county and sewer district sewer maps.
The sewer maps have gaps. A main can be there but not on the map. The sewer district decides.
Water
- Water system
- FIRGROVE MUTUAL INC
- Phone
- (253) 845-1542
Source: WA Department of Health service areas. The area shows who serves the lot, not where the pipe is. Ask the water system for the distance to the main and the cost.