Sign in

5706 PARKER RD E, Sumner, WA 98390

On MLS · $598,000 · 54 days · Redfin ↗

Lots near here →

27,983 sf · 100% outside sensitive areas

27,983 sf · 0.6 ac
Width ≈ 67 ft · Depth ≈ 422 ft
Outside sensitive areas about 28,000 sf
Width and depth are estimated.
County
Pierce County
Parcel ID
0520197056
Assessed land value
$265,200
Assessed building value
$0
Legal
Section 19 Township 20 Range 05 Quarter 31 L 3 OF S P 2003-06-13-5008 EXC E 10 FT CYD TO CY OF SUMNER PER ETN 4038721 TOG/W EASE OF REC OUT OF 3-184 SEG 2004-0382 3-17-04JK DC10/20/09CL

Values are from the county assessor.

Jurisdiction
Sumner
Zone
Medium Density Residential · Medium density residential district (MDR) →

Your lot

Lot area
27,983 sf
Net area
27,983 sf (lot area minus wetland, flood, steep slope)
Frontage
67 ft
Lot width
≈ 67 ft (estimated)
Lot depth
≈ 422 ft (estimated)

✔ You can build (by right)

1 unit
Single-family dwellingSMC 18.14.020(H)
Manufactured homeSMC 18.14.020(L)
Zero lot line detached dwellingSMC 18.14.020(F)
2 units
DuplexSMC 18.14.020(B)
TownhouseSMC 18.14.020(A)
3 units
MultiplexSMC 18.14.020(O)
TownhouseSMC 18.14.020(A)
ApartmentsSMC 18.14.020(N)
4+ units
Multiplex, up to 4 unitsSMC 18.14.020(O)
Townhouse, up to 14 unitsSMC 18.14.020(A)
Apartments, up to 14 unitsSMC 18.14.020(N)
Cottage houses or housing, up to 14 unitsSMC 18.14.020(E)
ADU
ADU with Single-family dwellingSMC 18.14.030(H)
ADU with Manufactured homeSMC 18.14.030(H)

Dividing the lot

Lot line adjustment
✗ Cannot be divided into 2 lotsSMC 17.08.040(C); 18.56.030(B)(3)
✗ Road frontage 67 ft is too short for 2 lots: each new lot needs 50 ft on the roadSMC 18.14.070(D)
Subdivision, short
✗ Cannot be divided into 2 lotsSMC 18.56.030(D)(1); 18.56.030(G)(4)
✗ Road frontage 67 ft is too short for 2 lots: each new lot needs 50 ft on the roadSMC 18.14.070(D)
Subdivision, full
✗ Cannot be divided into 10 lotsSMC 18.56.030(I)(3); 17.16.040(A)
✗ New lot area 2,798 sf < 5,000 sf required (short 2,202 sf)SMC 18.14.070(A)
✗ Road frontage 67 ft is too short for 2 lots: each new lot needs 50 ft on the roadSMC 18.14.070(D)
Zero lot line subdivision
✗ Cannot be divided into 10 lotsSMC 17.28.340(A); 18.56.030(I)(3)
✗ Each new lot of 2,798 sf is too small for a home in Medium Density Residential
Zero lot line short subdivision
? Up to 9 lots, needs verification · administrative reviewSMC 17.28.340(A); 18.56.030(D)(1); 18.56.030(G)(4)
How 9 lots are counted
✓ Lots: 9 ≤ 9 allowedSMC 17.04.040(A); 17.12.030
✓ Each new lot of 3,109 sf can hold a home
⚠ Needs to check:
  • New lot area: Zero lot line lot area and lot width per lot for purposes of subdivision may be as small as the minimum lot area and lot width specified in SMC § 18.14.070 plus any required private open space.SMC 17.28.340(C)

Counted: only lots that face an existing road.
Not checked: lot shape, and whether the lot was divided in the last 5 years.

Frontage (lot edge within 50 ft of a road)
Parker Rd Elocal road67 ft
Outside sensitive areas about 28,000 sf (wetland, flood, mapped stream buffer and slope 40% or more are taken off)
The largest rectangle that fits outside the sensitive areas. Setbacks and review areas are not taken off.
Easy to build: standard foundation, little grading.
Some extra cost: stepped foundation, steeper driveway.
Estimated from public maps. A site study and the permit review set the final area.

Source: USGS 3DEP bare-earth elevation (lidar), slope on a 3 m grid.
Check it on the WA DNR Lidar Portal ↗.

1. Soil on the lot

Foundation very limited · Rain water very limited

2. What it means for a house

Foundation
USDA soil rating for a house foundation · Soil A, 100% of the land outside sensitive areas
1
USDA rating
Not limitedSomewhat limitedVery limited

USDA rates every soil on 3 levels, from best to worst.

2
What "very limited" means

The soil has one or more features that are bad for this use. They usually cannot be fixed without major soil work, a special design, or costly building methods. Expect poor performance and high upkeep.

USDA text
"Very limited" indicates that the soil has one or more features that are unfavorable for the specified use. The limitations generally cannot be overcome without major soil reclamation, special design, or expensive installation procedures. Poor performance and high maintenance can be expected.
3
How USDA rates it

The use: A house of 3 stories or less, with no basement. It sits on concrete footings, about 2 ft deep.

The test: USDA checks soil features for this use, like flooding, ground water and slope. Each feature that limits the use gets a score from 0.01 to 1.00. The worst score sets the rating: 1.00 is very limited, a lower score is somewhat limited, no score is not limited.

USDA text
Dwellings are single-family houses of three stories or less. For dwellings without basements, the foundation is assumed to consist of spread footings of reinforced concrete built on undisturbed soil at a depth of 2 feet or at the depth of maximum frost penetration, whichever is deeper.
All features and their limits →
4
What USDA found here: 2 limiting features · worst 1.00 → very limited
  • FloodingNo limitWorst1.00The soil can flood. Flooding limits how a house can be built and used. Any flooding counts, even very rare.
    USDA text
    Soil that floods limit the installation and function for building site applications.
  • Depth to saturated zoneNo limitWorst0.99Ground water is close to the surface. The soil drains slowly and can get soggy in heavy rain.
    USDA text
    Soils with shallow depth to a water table maybe difficult to reclaim and revegetated. These areas are slow to drain and can become waterlogged and boggy during periods of heavy precipitation.
Rain water
USDA soil rating for soaking up rain water · Soil A, 100% of the land outside sensitive areas
1
USDA rating
Not limitedSomewhat limitedVery limited

USDA rates every soil on 3 levels, from best to worst.

2
What "very limited" means

The soil has one or more features that are bad for this use. They usually cannot be fixed without major soil work, a special design, or costly building methods. Expect poor performance and high upkeep.

USDA text
"Very limited" indicates that the soil has one or more features that are unfavorable for the specified system. The limitations generally cannot be overcome without major soil reclamation, special design, or expensive installation procedures. Poor performance and high maintenance can be expected.
3
How USDA rates it

The use: A shallow system that lets rain water soak into the ground, like a rain garden, a swale or porous paving. It holds 1 inch of rain, and the water should soak in within 24 to 48 hours.

The test: USDA checks soil features for this use, like flooding, ground water and slope. Each feature that limits the use gets a score from 0.01 to 1.00. The worst score sets the rating: 1.00 is very limited, a lower score is somewhat limited, no score is not limited.

USDA text
Shallow Infiltration Systems are a set of Best Management Practices for stormwater management. These systems include pervious pavement, buffer strips, filter strips, and vegetated swales. … The fundamental function of these systems is to hold the runoff generated from an area during a one inch rainfall event. … The water should infiltrate into the surrounding soil in 24 to 48 hours.
All features and their limits →
4
What USDA found here: 4 limiting features · worst 1.00 → very limited
  • WetnessNo limitWorst1.00Ground water comes close to the surface in the wet season.
    USDA text
    Soils having a high seasonal water table are limited for shallow infiltration systems.
  • FloodingNo limitWorst0.50Under flood water, the system cannot soak up rain.
    USDA text
    Soils that are flooded are limited for stromwater management practices because they cannot function to reduce runoff if they are under flood water.
  • Water movementNo limitWorst0.45Water moves slowly through the soil. The system needs more land, and if water is too slow, it cannot work.
    USDA text
    Soils that cannot transmit water rapidly enough require a larger area of land in order for the installed practice to store and infiltrate 1 inch of rain. At some point, the soil transmits water too slowly to allow a reasonably functioniong system to be installed.
  • Vegetation establishmentNo limitWorst0.16After digging, plants are harder to grow back. Better topsoil or soil amendments may be needed.
    USDA text
    Material rated fair can be vegetated and stabilized by modifying one or more properties. Topdressing with better material or applications of soil amendments may be necessary for satisfactory performance.

Source: USDA soil survey (SSURGO). It maps soil at about 1 inch = 1/4 mile, so a soil line can be off by 100 ft or more. For screening only.
USDA: "Onsite investigation may be needed to validate these interpretations and to confirm the identity of the soil on a given site."
Not checked: septic, liquefaction.

Needs a study
Soil that is wet for a long time each year, a sign of a possible wetland. The city or county may ask for a wetland study before a permit.
On the USDA soil map: Briscot loam

Estimated from public maps. A site study and the permit review set the final area.
Source: city and county wetland maps and review areas, city and county stream maps and review areas, city and county habitat maps, city and county landslide maps, NWI wetlands, DNR streams, WDFW priority habitats, DNR landslides, FEMA 100-year flood zones, USGS 3DEP slope, USDA soil survey.
Not checked: wetlands off the lot, stream buffers that the city or county does not map, habitats that WDFW does not show at their true place, landslides outside the areas that the DNR has studied. Not every city or county maps a review area, so a lot with none can still be in a wetland buffer.

Sewer

Inside UGA
yes
Nearest public main
30 ft
Provider
City of Sumner ↗ · 253-299-5740

Source: WA Urban Growth Areas; city, county and sewer district sewer maps.
The sewer maps have gaps. A main can be there but not on the map. The sewer district decides.

Water

Water system
SUMNER CITY OF
Phone
(253) 299-5740

Source: WA Department of Health service areas. The area shows who serves the lot, not where the pipe is. Ask the water system for the distance to the main and the cost.