MI · Medical Institution District
Bellevue, WA · LUC 20.10.390; 20.25J · Official code
By right: nothing · ADU not by right
1. What you can build
| 1 unit | 2 units | 3 units | 4+ units | Group living | |
|---|---|---|---|---|---|
| Homeless Services Use | — | — | — | — | HomeH ADU— |
✓ By right A Administrative review H Public hearing — Not allowed HOME = the main building n Only under condition n
2. Lot standards
| Standard | Value | Exceptions |
|---|---|---|
| Maximum residents | ||
| Maximum beds |
3. Building standards
| Standard | Value | Exceptions |
|---|---|---|
| Front setback | ||
| Side setback | ||
| Rear setback | ||
| Building separation | ||
| Maximum height | ||
| Maximum lot coverage | 75% LUC 20.25J.030 | |
| Maximum floor area ratio | ||
| Minimum parking | Homeless services uses are unspecified under the terms of LUC 20.20.590.F, and required parking stalls shall be established by the Director pursuant to LUC 20.20.590.F.2. LUC 20.20.455(I)(2)(a) |
4. ADU standards
Lot
No standards.
Building
No standards.
5. Dividing land
| Division | Approval | Lots | Density | Each new lot |
|---|---|---|---|---|
| Subdivision, Short LUC 20.45B.020; 20.45B.080; 20.45B.130 | A | up to 9 LUC 20.50.046 | — | Minimum lot size Not set LUC 20.45A.050 |
| Subdivision LUC 20.45A.170; 20.45A.210 | H | 10 or more LUC 20.50.046 | — | Minimum lot size Not set LUC 20.45A.050 |
✓ By right A Administrative review H Public hearing — Not allowed
Conditions
- The homeless services use is a permanent overnight shelter
- None of these is true:
- The homeless services use is a permanent overnight shelter
- All of these are true:
- The homeless services use is a permanent overnight shelter
- The shelter is more than one-half mile from any other homeless services use, or is co-located with it in a single development
- All of these are true:
- The homeless services use is a permanent overnight shelter
- The shelter is more than one-half mile from any other homeless services use, or is co-located with it in a single development
- All of these are true:
- The MI development area the site is in is da1
- The street or highway the MI setback is measured from is i405
- All of these are true:
- The MI development area the site is in is da1
- The street or highway the MI setback is measured from is ramps_ne8th
- All of these are true:
- The MI development area the site is in is da2
- The street or highway the MI setback is measured from is ne10th
- None of these is true:
- All of these are true:
- The MI development area the site is in is da1
- The street or highway the MI setback is measured from is i405
- All of these are true:
- The MI development area the site is in is da1
- The street or highway the MI setback is measured from is ramps_ne8th
- All of these are true:
- The MI development area the site is in is da2
- The street or highway the MI setback is measured from is ne10th
- All of these are true:
- The MI development area the site is in is da3
- The MI development area the site is in is not da3
- All of these are true:
- The MI development area the site is in is da2
- Building height is more than 40
- Not all of these are true:
- The MI development area the site is in is da2
- Building height is more than 40
- The MI development area the site is in is da1
- The MI development area the site is in is da2