Sign in

MDR8 · Medium density residential district

Black Diamond, WA · BDMC 18.32 · Official code

By right: 1 unit, 2 units, 3 units, 4+ units · ADU not by right

1. What you can build

1 unit2 units3 units4+ unitsGroup living
Single family structures
Home✓ ADUA1 A2 A3
————
Manufactured housing
Home✓4 ADUA5 A6 A7
————
Multi-family up to 6 units—
Home✓ ADUA1 A2 A3
Home✓ ADUA1 A2 A3
Home✓ ADUA1 A2 A3
—
Senior housing—
HomeH ADUA1 A2 A3
HomeH ADUA1 A2 A3
HomeH ADUA1 A2 A3
—
Cottage housing———
HomeA ADUA1 A2 A3
—
Manufacture home park———
HomeH ADUA1 A2 A3
—
Group Homes————
HomeH ADU—
Elderly housing————
HomeH ADU—

✓ By right   A Administrative review   H Public hearing   — Not allowed   HOME = the main building   n Only under condition n

2. Lot standards

StandardValueExceptions
Maximum unitsNot set BDMC 18.32.020
12 units BDMC 18.88.020(C)
for Cottage housing (4+ units)
Minimum unitsNot set BDMC 18.32.020
4 units BDMC 18.88.020(B)
for Cottage housing (4+ units)
Minimum lot size7,200 sq ft BDMC 18.32.040(A)(2)(a)
3,600 sq ft BDMC 18.32.040(A)(2)(b)
for Single family structures (1 unit); Manufactured housing (1 unit)4
14,400 sq ft BDMC 18.88.020(B)
for Cottage housing (4+ units)
Not set BDMC 18.90.040
for Manufacture home park (4+ units)
Minimum lot width50 ft BDMC 18.32.040(A)(3)
Not set BDMC 18.90.040
for Manufacture home park (4+ units)
Minimum lot depth70 ft BDMC 18.32.040(A)(4)
Not set BDMC 18.90.040
for Manufacture home park (4+ units)
Minimum densityNot set BDMC 18.32.040
4 units per acre BDMC 18.90.040(F)
for Manufacture home park (4+ units)
Maximum density
  • 8 units per acre8 BDMC 18.32.040(A)(1)
  • 12 units per acre9 BDMC 18.32.040(A)(1)
1 unit per 3,600 sq ft BDMC 18.88.040(A)(1)
for Cottage housing (4+ units)
10 units per acre BDMC 18.90.040(F)
for Manufacture home park (4+ units)
Not set BDMC 18.32.040
for Group Homes (group living); Elderly housing (group living)
Minimum development sizeNot set BDMC 18.32.040
14,400 sq ft BDMC 18.88.020(B)
for Cottage housing (4+ units)
435,600 sq ft BDMC 18.90.040(C)
for Manufacture home park (4+ units)

3. Building standards

StandardValueExceptions
Front setback
  • 20 ft10 BDMC 18.32.040(A)(5)(a)
  • 25 ft11 BDMC 18.32.040(A)(5)(b)
15 ft BDMC 18.88.040(E)(3)
for Cottage housing (4+ units)
20 ft BDMC 18.90.040(D)(1)
for Manufacture home park (4+ units)
Side setback7 ft BDMC 18.32.040(A)(6)(a)
  • 7 ft12 BDMC 18.32.040(A)(6)(a)
  • 3 ft13 BDMC 18.34.030(E)
for Single family structures (1 unit); Manufactured housing (1 unit)4
20 ft BDMC 18.90.040(D)(1)
for Manufacture home park (4+ units)
Street side setback10 ft BDMC 18.32.040(A)(6)(b)
15 ft BDMC 18.88.040(E)(3)
for Cottage housing (4+ units)
20 ft BDMC 18.90.040(D)(2)
for Manufacture home park (4+ units)
Rear setback10 ft BDMC 18.32.040(A)(7)
20 ft BDMC 18.90.040(D)(1)
for Manufacture home park (4+ units)
Building separation10 ft BDMC 18.32.040(A)(10)
Maximum height35 ft BDMC 18.32.040(A)(9)(a)
18 ft BDMC 18.88.040(B)(1)
for Cottage housing (4+ units)
Maximum lot coverage50% BDMC 18.32.040(A)(8)
45% BDMC 18.88.040(C)(1)
for Cottage housing (4+ units)
Maximum impervious surfaceNot set BDMC 18.32.040
70% BDMC 18.88.040(C)(2)
for Cottage housing (4+ units)
Minimum parkingFor conditional uses permitted under this title that are not within a category in the table at 18.80.030(E), the parking requirement shall be as provided by the applicable decision maker in the conditions of approval. BDMC 18.80.030(B)
2 spaces per unit BDMC 18.32.040(B); 18.80.030(E)
for Single family structures (1 unit); Manufactured housing (1 unit)4
0.75 spaces per unit BDMC 18.80.030(E)
for Senior housing (2, 3, 4+ units)
  • 1 space per unit14 BDMC 18.80.030(E)
  • 1.75 spaces per unit15 BDMC 18.32.040(B); 18.80.030(E)
for Multi-family up to 6 units (3, 4+ units)
1.25 spaces per unit BDMC 18.88.040(H)(1)
for Cottage housing (4+ units)
1.5 spaces per unit BDMC 18.90.040(J)(1)
for Manufacture home park (4+ units)
Maximum unit sizeNot set BDMC 18.32.040
1.5 × 800 sq ft BDMC 18.88.040(D)(2); 18.88.040(D)(3)
for Cottage housing (4+ units)
Minimum open spaceNot set BDMC 18.32.040
15% BDMC 18.90.040(E)(1)
for Manufacture home park (4+ units)
Maximum units per buildingNot set BDMC 18.32.040
6 units BDMC 18.32.020(A)(2)
for Multi-family up to 6 units (2, 3, 4+ units)

4. ADU standards

Lot

StandardValueExceptions
Maximum units1 unit BDMC 18.56.030(B)
2 units BDMC 18.56.030(B)
for Single family structures (1 unit)2; Manufactured housing (1 unit)6; Multi-family up to 6 units (2, 3, 4+ units)2; Senior housing (2, 3, 4+ units)2; Cottage housing (4+ units)2; Manufacture home park (4+ units)2
Minimum lot size3,600 sq ft BDMC 18.56.030(A); 18.32.040(A)(2)(b)

Building

StandardValueExceptions
Front setback
  • 20 ft10 BDMC 18.32.040(A)(5)(a)
  • 25 ft11 BDMC 18.32.040(A)(5)(b)
Side setback7 ft BDMC 18.32.040(A)(6)(a)
Rear setback10 ft BDMC 18.32.040(A)(7)
Maximum height26 ft BDMC 18.56.030(E); 18.32.040(A)(9)(b)
35 ft BDMC 18.56.030(A); 18.32.040(A)(9)(a)
for Single family structures (1 unit)3; Manufactured housing (1 unit)7; Multi-family up to 6 units (2, 3, 4+ units)3; Senior housing (2, 3, 4+ units)3; Cottage housing (4+ units)3; Manufacture home park (4+ units)3
Minimum parking1 space per unit BDMC 18.56.030(F)
Maximum unit size1,000 sq ft BDMC 18.56.030(D)
Not set BDMC 18.56.030(D)
for Single family structures (1 unit)3; Manufactured housing (1 unit)7; Multi-family up to 6 units (2, 3, 4+ units)3; Senior housing (2, 3, 4+ units)3; Cottage housing (4+ units)3; Manufacture home park (4+ units)3
Attached to the main houseNot required BDMC 18.56.030(B)
Required BDMC 18.56.030(B)
for Single family structures (1 unit)3; Manufactured housing (1 unit)7; Multi-family up to 6 units (2, 3, 4+ units)3; Senior housing (2, 3, 4+ units)3; Cottage housing (4+ units)3; Manufacture home park (4+ units)3
Owner lives on siteRequired BDMC 18.56.040(A)

5. Dividing land

DivisionApprovalLotsDensityEach new lot
Short subdivision BDMC 17.32.050 A up to 6 BDMC 17.08.010 —
Minimum lot size
3,600 sq ft BDMC 18.32.040(A)(2)(b)
Minimum lot width
50 ft BDMC 18.32.040(A)(3)
Minimum lot depth
70 ft BDMC 18.32.040(A)(4)
Subdivision BDMC 17.16.020; 17.16.030 H 7 or more BDMC 17.08.010
  • 8 units per acre, on the net lot area8 BDMC 17.15.020(A)(2); 18.32.040(A)(1)
  • 12 units per acre, on the net lot area9 BDMC 17.15.020(A)(2); 18.32.040(A)(1)
Minimum lot size
3,600 sq ft BDMC 18.32.040(A)(2)(b)
Minimum lot width
50 ft BDMC 18.32.040(A)(3)
Minimum lot depth
70 ft BDMC 18.32.040(A)(4)
Residential cluster development (RCD) BDMC 18.86.030(A) H —
  • 8 units per acre, on the net lot area8 BDMC 18.86.040(A)(1); 18.32.040(A)(1)
  • 12 units per acre, on the net lot area9 BDMC 18.86.040(A)(1); 18.32.040(A)(1)
Minimum parent area
3 × 3,600 sq ft BDMC 18.86.040(A)(2); 18.32.040(A)(2)(b)
Minimum units
3 units BDMC 18.86.020(B)
Minimum lot size
2,800 sq ft BDMC 18.86.040(A)(3)(c)

✓ By right   A Administrative review   H Public hearing   — Not allowed

Conditions

  1. Which ADUs the lot adds - one attached ADU within the existing building footprint, one ADU from new construction (detached), or one of each is detached
  2. Which ADUs the lot adds - one attached ADU within the existing building footprint, one ADU from new construction (detached), or one of each is attached_and_detached
  3. Which ADUs the lot adds - one attached ADU within the existing building footprint, one ADU from new construction (detached), or one of each is attached
  4. All of these are true:
    • The home is approved by the Washington State Department of Labor and Industries or the U.S. Department of Housing and Urban Development, with the certification insignia affixed
    • The home is comprised of at least two fully enclosed parallel sections each of not less than twelve feet wide by thirty-six feet long
    • The home is set upon a permanent foundation, with the space from the bottom of the home to the ground enclosed by concrete or an approved concrete product
    • The manufactured home is a new manufactured home as defined in RCW 35.63.160(2)
  5. All of these are true:
    • The home is approved by the Washington State Department of Labor and Industries or the U.S. Department of Housing and Urban Development, with the certification insignia affixed
    • The home is comprised of at least two fully enclosed parallel sections each of not less than twelve feet wide by thirty-six feet long
    • The home is set upon a permanent foundation, with the space from the bottom of the home to the ground enclosed by concrete or an approved concrete product
    • The manufactured home is a new manufactured home as defined in RCW 35.63.160(2)
    • Which ADUs the lot adds - one attached ADU within the existing building footprint, one ADU from new construction (detached), or one of each is detached
  6. All of these are true:
    • The home is approved by the Washington State Department of Labor and Industries or the U.S. Department of Housing and Urban Development, with the certification insignia affixed
    • The home is comprised of at least two fully enclosed parallel sections each of not less than twelve feet wide by thirty-six feet long
    • The home is set upon a permanent foundation, with the space from the bottom of the home to the ground enclosed by concrete or an approved concrete product
    • The manufactured home is a new manufactured home as defined in RCW 35.63.160(2)
    • Which ADUs the lot adds - one attached ADU within the existing building footprint, one ADU from new construction (detached), or one of each is attached_and_detached
  7. All of these are true:
    • The home is approved by the Washington State Department of Labor and Industries or the U.S. Department of Housing and Urban Development, with the certification insignia affixed
    • The home is comprised of at least two fully enclosed parallel sections each of not less than twelve feet wide by thirty-six feet long
    • The home is set upon a permanent foundation, with the space from the bottom of the home to the ground enclosed by concrete or an approved concrete product
    • The manufactured home is a new manufactured home as defined in RCW 35.63.160(2)
    • Which ADUs the lot adds - one attached ADU within the existing building footprint, one ADU from new construction (detached), or one of each is attached
  8. None of these is true:
    • The project uses transfer of development rights
  9. The project uses transfer of development rights
  10. None of these is true:
    • The front yard is on a major street
  11. The front yard is on a major street
  12. Lot width is at least 40 ft
  13. Lot width is less than 40 ft
  14. Bedrooms in one unit is 0
  15. Bedrooms in one unit is at least 1