C-1 · C-1 (Downtown Commercial)
Cheney, WA · CMC 21.32 · Official code
By right: 1 unit · ADU not by right
1. What you can build
| 1 unit | 2 units | 3 units | 4+ units | Group living | |
|---|---|---|---|---|---|
| Single Dwelling, Attached | — | — | — | — | |
| Live/work Unit | Home✓ ADU— | — | — | — | — |
| Townhouse | — | — | — | ||
| Multi-Dwelling Units | — | — | — | ||
| Senior Housing | — | — | — | HomeH ADU— | — |
| Household Living | — | — | — | — | |
| Group Living | — | — | — | — | HomeH ADU— |
✓ By right A Administrative review H Public hearing — Not allowed HOME = the main building n Only under condition n
2. Lot standards
| Standard | Value | Exceptions |
|---|---|---|
| Minimum lot size | 1,600 sq ft CMC 21.32.040(B) | |
| Minimum lot width | 20 ft CMC 21.32.040(B) | |
| Minimum lot depth | 80 ft CMC 21.32.040(B) | |
| Maximum density | Not set CMC 21.32.040(B) |
3. Building standards
| Standard | Value | Exceptions |
|---|---|---|
| Maximum front setback | 0 ft CMC 21.32.040(B) | |
| Side setback | 0 ft CMC 21.32.040(B) | |
| Street side setback | 0 ft CMC 21.32.040(B) | |
| Rear setback | 0 ft CMC 21.32.040(B) | |
| Building separation | No limit CMC 21.32.040(B) | |
| Maximum height | ||
| Maximum lot coverage | 100% CMC 21.32.040(B) | |
| Minimum parking | 2 spaces per unit CMC 21.32.060; 21.40.020(1) | the largest of 1, bedrooms in one unit spaces per unit CMC 21.32.060; 21.40.020(1)
0.5 × bedrooms in one unit spaces per unit CMC 21.32.060; 21.40.020(1)
for Senior Housing (4+ units) 1 space per resident CMC 21.32.060; 21.40.020(1)
for Group Living (group living) |
| Minimum open space | 0% CMC 21.32.040(B) |
4. ADU standards
Lot
No standards.
Building
No standards.
5. Dividing land
| Division | Approval | Lots | Density | Each new lot |
|---|---|---|---|---|
| Short plat CMC 22.26.110(a) | A | up to 4 CMC 22.08.005 | — | Minimum lot size 1,600 sq ft CMC 21.32.040(B) Minimum lot width 20 ft CMC 21.32.040(B) Minimum frontage Not set CMC 22.24.040(1) Maximum units per lot Not set CMC 22.24.040 |
| Subdivision CMC 22.12.020(a); 22.04.090 | H | 5 or more CMC 22.08.005 | — | Minimum lot size 1,600 sq ft CMC 21.32.040(B) Minimum lot width 20 ft CMC 21.32.040(B) Minimum frontage Not set CMC 22.24.040(1) Maximum units per lot Not set CMC 22.24.040 |
| Binding site plan CMC 22.27.030(a) | A | up to 3 CMC 22.27.030(a) | — | Minimum lot size 1,600 sq ft CMC 21.32.040(B) Minimum lot width 20 ft CMC 21.32.040(B) Minimum frontage Not set CMC 22.24.040(1) Maximum units per lot Not set CMC 22.24.040 |
| Binding site plan CMC 22.27.030(b) | H | 5 or more CMC 22.27.030(b) | — | Minimum lot size 1,600 sq ft CMC 21.32.040(B) Minimum lot width 20 ft CMC 21.32.040(B) Minimum frontage Not set CMC 22.24.040(1) Maximum units per lot Not set CMC 22.24.040 |
✓ By right A Administrative review H Public hearing — Not allowed
Conditions
- All of these are true:
- The residential units are located above the ground floor of the structure
- Any of these is true:
- None of these is true:
- The residential units are part of a mixed-use structure
- The residential units are located off of an alley
- None of these is true:
- The residential units are located above the ground floor of the structure
- All of these are true:
- The parcel is on the north side of 1st Street between Cocolalla Street and "H" Street
- The project is mixed-use at a ratio of 70 percent residential / 30 percent commercial
- All of these are true:
- Not all of these are true:
- The parcel is on the north side of 1st Street between Cocolalla Street and "H" Street
- The project is mixed-use at a ratio of 70 percent residential / 30 percent commercial
- Any of these is true:
- The parcel is on 2nd Street between "A" Street and "H" Street
- The parcel is on 3rd Street between "A" Street and "C" Street
- The parcel is on 3rd Street between "F" Street and "H" Street
- Not all of these are true:
- All of these are true:
- Not all of these are true:
- The parcel is on the north side of 1st Street between Cocolalla Street and "H" Street
- The project is mixed-use at a ratio of 70 percent residential / 30 percent commercial
- The parcel is on 2nd Street between "A" Street and "H" Street
- The parcel is on 3rd Street between "A" Street and "C" Street
- The parcel is on 3rd Street between "F" Street and "H" Street
- Not all of these are true:
- The portion of the structure is within 50 feet of a residential zoning district line
- All of these are true:
- Residential use represents 50% of the floor area exceeding 35 feet
- The portion of the structure is within 50 feet of a residential zoning district line
- None of these is true:
- The portion of the structure is within 50 feet of a residential zoning district line
- Residential use represents 50% of the floor area exceeding 35 feet
- The residential lot fronts on a community arterial
- None of these is true:
- The residential lot fronts on a community arterial