Sign in

R-3H · R-3H (High Density multi-family)

Cheney, WA · CMC 21.24 · Official code

By right: 1 unit, 2 units, 3 units, 4+ units · ADU allowed by right

1. What you can build

1 unit2 units3 units4+ unitsGroup living
Single Dwelling, Detached
Home✓ ADU✓1
————
Single Dwelling, Attached
Home✓ ADU—
————
Duplexes—
Home✓ ADU—
———
Townhouse——
Home✓ ADU—
Home✓ ADU—
—
Multi-Dwelling Units——
Home✓ ADU—
Home✓ ADU—
—
Senior Housing———
Home✓ ADU—
—
Residential Care Homes————
Home✓ ADU—

✓ By right   A Administrative review   H Public hearing   — Not allowed   HOME = the main building   n Only under condition n

2. Lot standards

StandardValueExceptions
Minimum lot size
  • 2,000 sq ft2 CMC 21.24.050(C) note 1
  • 3,500 sq ft3 CMC 21.24.050(C)
5,000 sq ft CMC 21.24.050(C)
for Duplexes (2 units); Multi-Dwelling Units (3, 4+ units); Senior Housing (4+ units)
Minimum lot width50 ft CMC 21.24.050(C)
  • 25 ft2 CMC 21.24.050(C) note 1
  • 35 ft3 CMC 21.24.050(C)
for Single Dwelling, Detached (1 unit); Residential Care Homes (group living)
  • 20 ft2 CMC 21.24.050(C) note 1
  • 35 ft3 CMC 21.24.050(C)
for Single Dwelling, Attached (1 unit); Townhouse (3, 4+ units)
Maximum density32 units per acre, a fraction of 0.5 or more rounds up, on the net lot area CMC 21.24.040(A)(1)-(3); 21.24.020(B); 21.10.020
Not set CMC 21.24.040; 21.24.050(C)
for Residential Care Homes (group living)
Maximum residents6 persons CMC 21.24.030(B) note 1; 21.08.010

3. Building standards

StandardValueExceptions
Front setback
  • 12 ft2 CMC 21.24.050(C) note 1
  • 15 ft3 CMC 21.24.050(C) note 1
Side setback
  • 0 ft4 CMC 21.24.050(C) note 3; 21.24.050(L)(2)
  • 5 ft5 CMC 21.24.050(C)
Total side setbacks
  • 5 ft4 CMC 21.24.050(C) note 3
  • 10 ft5 CMC 21.24.050(C)
Street side setback5 ft CMC 21.24.050(C)
Rear setback
  • 15 ft6 CMC 21.24.050(C) note 2
  • 20 ft7 CMC 21.24.050(C)
Maximum height45 ft CMC 21.24.050(C) note 4
Maximum lot coverage50% CMC 21.24.050(C)
Minimum parking2 spaces per unit CMC 21.24.060; 21.40.020(1)
1 × bedrooms in one unit spaces per unit CMC 21.24.060; 21.40.020(1)
for Duplexes (2 units)
the largest of 1, bedrooms in one unit spaces per unit CMC 21.24.060; 21.40.020(1); 21.40.020(8)
for Multi-Dwelling Units (3, 4+ units)
0.5 × bedrooms in one unit spaces per unit CMC 21.24.060; 21.40.020(1)
for Senior Housing (4+ units)
1 space per resident CMC 21.24.060; 21.40.020(1)
for Residential Care Homes (group living)
Minimum open space(250 ÷ lot area) × 100% CMC 21.24.050(C)
((75 × main dwelling units on the lot) ÷ lot area) × 100% CMC 21.24.050(C)
for Multi-Dwelling Units (3, 4+ units); Senior Housing (4+ units)

4. ADU standards

Lot

StandardValueExceptions
Maximum units1 unit CMC 21.67.030(a)
Minimum lot size5,000 sq ft CMC 21.67.030(b)

Building

StandardValueExceptions
Front setback
  • 12 ft2 CMC 21.24.050(C) note 1; 21.67.030(e)
  • 15 ft3 CMC 21.24.050(C) note 1; 21.67.030(e)
Side setback
  • 0 ft4 CMC 21.24.050(C) note 3; 21.24.050(L)(2); 21.67.030(e)
  • 5 ft5 CMC 21.24.050(C); 21.67.030(e)
Rear setback
  • 15 ft6 CMC 21.24.050(C) note 2; 21.67.030(e)
  • 20 ft7 CMC 21.24.050(C); 21.67.030(e)
Maximum height
  • 25 ft8 CMC 21.67.030(f)
  • 45 ft9 CMC 21.67.030(f); 21.24.050(C)
Minimum parking
  • 0 spaces per unit10 CMC 21.67.030(k)
  • 1 space per unit11 CMC 21.67.030(k)
Maximum unit size0.4 × floor area of the main house sq ft CMC 21.67.030(i)
Attached to the main houseNot required CMC 21.67.030(d)(1)-(5)
Owner lives on siteRequired CMC 21.67.030(s)

5. Dividing land

DivisionApprovalLotsDensityEach new lot
Short plat CMC 22.26.110(a) A up to 4 CMC 22.08.005 32 units per acre, a fraction of 0.5 or more rounds up, on the net lot area CMC 21.24.040(A)(1)-(3); 21.24.020(B); 21.10.020
Minimum lot size
  • 2,000 sq ft2 CMC 21.24.050(C) note 1
  • 3,500 sq ft3 CMC 21.24.050(C)
Minimum lot width
  • 25 ft2 CMC 21.24.050(C) note 1
  • 35 ft3 CMC 21.24.050(C)
Minimum lot depth
  • 120 ft12 CMC 22.24.040(6)
  • Not set13 CMC 21.24.050(C)
Minimum frontage
Not set CMC 22.24.040(1)
Maximum units per lot
Not set CMC 22.24.040
Subdivision CMC 22.12.020(a); 22.04.090 H 5 or more CMC 22.08.005 32 units per acre, a fraction of 0.5 or more rounds up, on the net lot area CMC 21.24.040(A)(1)-(3); 21.24.020(B); 21.10.020
Minimum lot size
  • 2,000 sq ft2 CMC 21.24.050(C) note 1
  • 3,500 sq ft3 CMC 21.24.050(C)
Minimum lot width
  • 25 ft2 CMC 21.24.050(C) note 1
  • 35 ft3 CMC 21.24.050(C)
Minimum lot depth
  • 120 ft12 CMC 22.24.040(6)
  • Not set13 CMC 21.24.050(C)
Minimum frontage
Not set CMC 22.24.040(1)
Maximum units per lot
Not set CMC 22.24.040
Binding site plan CMC 22.27.030(a) A14 up to 3 CMC 22.27.030(a) 32 units per acre, a fraction of 0.5 or more rounds up, on the net lot area CMC 21.24.040(A)(1)-(3); 21.24.020(B); 21.10.020
Minimum lot size
  • 2,000 sq ft2 CMC 21.24.050(C) note 1
  • 3,500 sq ft3 CMC 21.24.050(C)
Minimum lot width
  • 25 ft2 CMC 21.24.050(C) note 1
  • 35 ft3 CMC 21.24.050(C)
Minimum lot depth
  • 120 ft12 CMC 22.24.040(6)
  • Not set13 CMC 21.24.050(C)
Minimum frontage
Not set CMC 22.24.040(1)
Maximum units per lot
Not set CMC 22.24.040
Binding site plan CMC 22.27.030(b) H14 5 or more CMC 22.27.030(b) 32 units per acre, a fraction of 0.5 or more rounds up, on the net lot area CMC 21.24.040(A)(1)-(3); 21.24.020(B); 21.10.020
Minimum lot size
  • 2,000 sq ft2 CMC 21.24.050(C) note 1
  • 3,500 sq ft3 CMC 21.24.050(C)
Minimum lot width
  • 25 ft2 CMC 21.24.050(C) note 1
  • 35 ft3 CMC 21.24.050(C)
Minimum lot depth
  • 120 ft12 CMC 22.24.040(6)
  • Not set13 CMC 21.24.050(C)
Minimum frontage
Not set CMC 22.24.040(1)
Maximum units per lot
Not set CMC 22.24.040

✓ By right   A Administrative review   H Public hearing   — Not allowed

Conditions

  1. None of these is true:
    • A home occupation is operating in the dwelling or on the lot
  2. Parking (driveway) for the lot is accessed off an alley
  3. None of these is true:
    • Parking (driveway) for the lot is accessed off an alley
  4. The house is part of a zero lot line development of at least four lots grouped together, with one side setback reduced to zero
  5. None of these is true:
    • The house is part of a zero lot line development of at least four lots grouped together, with one side setback reduced to zero
  6. The lot is a corner lot
  7. None of these is true:
    • The lot is a corner lot
  8. The ADU is a separate detached dwelling unit (not an internal conversion or an addition to the primary dwelling)
  9. None of these is true:
    • The ADU is a separate detached dwelling unit (not an internal conversion or an addition to the primary dwelling)
  10. On-street parking (spaces legally available, not time- or day-restricted) is available for the ADU
  11. None of these is true:
    • On-street parking (spaces legally available, not time- or day-restricted) is available for the ADU
  12. The residential lot fronts on a community arterial
  13. None of these is true:
    • The residential lot fronts on a community arterial
  14. The improvements will be included in one or more condominiums or owned by an association in which the unit owners have a membership interest