Sign in

TC · Town Center District

Concrete, WA · CMC 19.09.010 · Official code

By right: 3 units, 4+ units · ADU not by right

1. What you can build

1 unit2 units3 units4+ unitsGroup living
Townhouse——
Home✓ ADU—
Home✓ ADU—
—
Fiveplex———
Home✓ ADU—
—
Sixplex———
Home✓ ADU—
—
Courtyard buildings———
Home✓ ADU—
—
Stacked flats———
Home✓ ADU—
—
Mixed-use———
Home✓ ADU—
—
Affordable housing———
Home✓ ADU—
—
Permanent supportive housing (PSH)———
Home✓ ADU—
—
Co-living housing units————
Home✓ ADU—
Transitional housing————
HomeH ADU—
Emergency housing————
HomeH ADU—
Emergency shelters————
HomeH ADU—
Encampments on a religious property————
HomeH ADU—
Nursing homes————
Home✓ ADU—

✓ By right   A Administrative review   H Public hearing   — Not allowed   HOME = the main building   n Only under condition n

2. Lot standards

StandardValueExceptions
Maximum unitsNot set CMC 19.20.020
5 units CMC 19.06.251
for Fiveplex (4+ units)
6 units CMC 19.06.691
for Sixplex (4+ units)
4 units CMC 19.06.141
for Courtyard buildings (4+ units)
Minimum unitsNot set CMC 19.20.020
5 units CMC 19.06.251
for Fiveplex (4+ units)
6 units CMC 19.06.691
for Sixplex (4+ units)
Minimum lot size
  • 2,000 sq ft1 CMC 19.20.020(1)
  • Not set2 CMC 19.20.020
  • 6,500 sq ft2 CMC 19.20.020
  • 6,500 sq ft1 CMC 19.20.020(1)
for Townhouse (3 units)
  • 9,500 sq ft2 CMC 19.20.020
  • 9,500 sq ft1 CMC 19.20.020(1)
for Fiveplex (4+ units)
  • 6,000 sq ft2 CMC 19.20.020
  • 6,000 sq ft1 CMC 19.20.020(1)
for Sixplex (4+ units)
  • 10,200 sq ft2 CMC 19.20.020
  • 10,200 sq ft1 CMC 19.20.020(1)
for Townhouse (4+ units); Stacked flats (4+ units)
  • 7,500 sq ft2 CMC 19.20.020
  • 7,500 sq ft1 CMC 19.20.020(1)
for Courtyard buildings (4+ units)
Minimum lot width25 ft CMC 19.20.020
80 ft CMC 19.20.020
for Townhouse (3 units); Courtyard buildings (4+ units)
90 ft CMC 19.20.020
for Fiveplex (4+ units)
55 ft CMC 19.20.020
for Sixplex (4+ units)
120 ft CMC 19.20.020
for Townhouse (4+ units); Stacked flats (4+ units)
Minimum lot depth0 ft CMC 19.20.020
85 ft CMC 19.20.020
for Townhouse (3 units); Stacked flats (4+ units)
105 ft CMC 19.20.020
for Fiveplex (4+ units)
100 ft CMC 19.20.020
for Sixplex (4+ units); Courtyard buildings (4+ units)
60 ft CMC 19.20.020
for Townhouse (4+ units)

3. Building standards

StandardValueExceptions
Front setback0 ft CMC 19.20.020
Maximum front setback10 ft CMC 19.20.020(3)
Side setback0 ft CMC 19.20.020
Rear setback0 ft CMC 19.20.020
Maximum height35 ft CMC 19.20.020
Maximum lot coverage100% CMC 19.20.020
Minimum parking
  • 1 space per unit3 CMC 19.54.020
  • 2 spaces per unit4 CMC 19.54.020
Total requirements shall be the sum of the requirements for the principal uses computed separately CMC 19.54.020
for Mixed-use (4+ units)
1 + sleeping units in the project + (employees on the largest shift ÷ 4) spaces CMC 19.54.020
for Co-living housing units (group living)
sleeping units in the project + (employees on the largest shift ÷ 4) spaces CMC 19.54.020
for Transitional housing (group living); Emergency housing (group living); Emergency shelters (group living)
(0.25 × sleeping units in the project) + (employees on the largest shift ÷ 4) spaces CMC 19.54.020
for Encampments on a religious property (group living)
0.25 spaces per bed CMC 19.54.020
for Nursing homes (group living)
Maximum units per buildingNot set CMC 19.20.020
4 units CMC 19.06.141
for Courtyard buildings (4+ units)

4. ADU standards

Lot

No standards.

Building

No standards.

5. Dividing land

DivisionApprovalLotsDensityEach new lot
Short subdivision CMC 18.08.030(5); 17.12.050(2) H up to 4 CMC 17.04.045; 17.12.010(1) —
Minimum lot size
  • 2,000 sq ft1 CMC 19.20.020(1)
  • Not set2 CMC 19.20.020
Minimum lot width
25 ft CMC 19.20.020
Minimum lot depth
0 ft CMC 19.20.020
Minimum frontage
Not set CMC 19.20.020
Maximum units per lot
Not set CMC 19.20.020
Subdivision CMC 17.08.026 H 5 or more CMC 17.04.045 —
Minimum lot size
  • 2,000 sq ft1 CMC 19.20.020(1)
  • Not set2 CMC 19.20.020
Minimum lot width
25 ft CMC 19.20.020
Minimum lot depth
0 ft CMC 19.20.020
Minimum frontage
Not set CMC 19.20.020
Maximum units per lot
Not set CMC 19.20.020
Binding site plan CMC 18.08.030(5); 17.20.045 H 2 or more CMC 17.20.030 —
Minimum lot size
  • 2,000 sq ft1 CMC 19.20.020(1)
  • Not set2 CMC 19.20.020
Minimum lot width
25 ft CMC 19.20.020
Minimum lot depth
0 ft CMC 19.20.020
Minimum frontage
Not set CMC 19.20.020
Maximum units per lot
Not set CMC 19.20.020

✓ By right   A Administrative review   H Public hearing   — Not allowed

Conditions

  1. None of these is true:
    • Public sewer is available to the lot
  2. Public sewer is available to the lot
  3. Bedrooms in one unit is at most 2
  4. Bedrooms in one unit is at least 3