1. What you can build
| 1 unit | 2 units | 3 units | 4+ units | Group living | |
|---|---|---|---|---|---|
| Substance abuse treatment facility that includes a housing component | — | — | — | — | HomeH ADU— |
✓ By right A Administrative review H Public hearing — Not allowed HOME = the main building n Only under condition n
2. Lot standards
| Standard | Value | Exceptions |
|---|---|---|
| Minimum lot size | No limit FMC 18.49.040 | |
| Minimum lot width | No limit FMC 18.49.050 |
3. Building standards
| Standard | Value | Exceptions |
|---|---|---|
| Front setback | 0 ft FMC 18.49.070(A)(1) | |
| Side setback | ||
| Rear setback | ||
| Maximum height | 45 ft FMC 18.49.060 | |
| Maximum lot coverage | No limit FMC 18.49.070(B) | |
| Minimum parking | 1 space per each 300 square feet FMC 18.49.080; 18.76.070 |
4. ADU standards
Lot
No standards.
Building
No standards.
5. Dividing land
| Division | Approval | Lots | Density | Each new lot |
|---|---|---|---|---|
| Short subdivision FMC 17.12.030; 17.12.005 | A | up to 9 FMC 17.08.190 | — | Minimum lot size No limit FMC 18.49.040 Minimum lot width No limit FMC 18.49.050 |
| Subdivision FMC 17.20.020 | H | 10 or more FMC 17.08.210 | — | Minimum lot size No limit FMC 18.49.040 Minimum lot width No limit FMC 18.49.050 |
✓ By right A Administrative review H Public hearing — Not allowed
Conditions
- The site adjoins any residential zoning district
- None of these is true:
- The site adjoins any residential zoning district