Lake Stevens, WA · LSMC 14.36.020(c) · Official code
By right: nothing · ADU not by right
1. What you can build
| 1 unit | 2 units | 3 units | 4+ units | Group living | |
|---|---|---|---|---|---|
| Apartment(s) above permitted nonresidential use | — | ||||
| Co-Living Housing | — | — | — | — | Home✓ ADU— |
| Emergency Housing | — | — | — | — | HomeA ADU— |
| Emergency Shelters | — | — | — | — | HomeA ADU— |
| Permanent Supportive Housing | — | — | — | — | Home✓ ADU— |
| Transitional Housing | — | — | — | — | HomeA ADU— |
| Group homes for licensed juvenile offenders | — | — | — | — | Home✓ ADU— |
| Temporary encampments | — | — | — | — |
✓ By right A Administrative review H Public hearing — Not allowed HOME = the main building n Only under condition n
2. Lot standards
| Standard | Value | Exceptions |
|---|---|---|
| Minimum lot size | Not set LSMC Table 14.48-II | 7,500 sq ft LSMC 14.44.038(g)(3)(i)
for Temporary encampments (group living)2 |
| Minimum frontage | 20 ft LSMC Table 14.48-II; Table 14.48-II note 8; 14.38.015 | Not set LSMC 14.44.038(g)(3)
for Temporary encampments (group living)2 |
| Maximum residents | Not set LSMC 14.08.010 | 50 persons LSMC 14.44.038(g)(2)(ii)
for Temporary encampments (group living)2 |
3. Building standards
| Standard | Value | Exceptions |
|---|---|---|
| Front setback | 5 ft LSMC Table 14.48-II | 20 ft LSMC 14.44.038(g)(3)(ii)
for Temporary encampments (group living)2 |
| Side setback | 10 ft LSMC Table 14.48-II | 20 ft LSMC 14.44.038(g)(3)(ii)
for Temporary encampments (group living)2 |
| Street side setback | 10 ft LSMC Table 14.48-II; 14.48.035(a) | 20 ft LSMC 14.44.038(g)(3)(ii)
for Temporary encampments (group living)2 |
| Rear setback | 10 ft LSMC Table 14.48-II | 20 ft LSMC 14.44.038(g)(3)(ii)
for Temporary encampments (group living)2 |
| Building separation | 10 ft LSMC Table 14.48-II note 2 | |
| Maximum height | ||
| Minimum parking | 2 spaces per unit LSMC 14.72.010(e) Table 14.72-I | 2.25 spaces per unit LSMC 14.72.010(e) Table 14.72-I
for Apartment(s) above permitted nonresidential use (3, 4+ units)1 for Co-Living Housing (group living) Approval of a project-specific parking analysis is required as part of the required Site Management Plan, per LSMC § 14.44.100(c). LSMC 14.72.010(e) Table 14.72-I; 14.44.100(c)(1)(iii)
for Emergency Housing (group living); Emergency Shelters (group living) Subject to the parking requirements for the associated residential building form/type, as listed in this chapter and defined in Chapter 14.08 LSMC. LSMC 14.72.010(e) Table 14.72-I
for Permanent Supportive Housing (group living); Transitional Housing (group living) 1 space for each staff person on site during the maximum shift plus 1 space for each facility vehicle plus 1 space for every 3 beds. LSMC 14.72.010(e) Table 14.72-I
for Group homes for licensed juvenile offenders (group living) Each site upon which a temporary encampment is operated must provide or have available a parking and vehicular maneuvering area. LSMC 14.44.038(e)(1)(i)
for Temporary encampments (group living)2 |
4. ADU standards
Lot
No standards.
Building
No standards.
5. Dividing land
| Division | Approval | Lots | Density | Each new lot |
|---|---|---|---|---|
| Short subdivision (short plat) LSMC 14.18.025(a); Table 14.16A-I | A | up to 9 LSMC 14.18.010; 14.08.010 | — | Minimum frontage 20 ft LSMC Table 14.48-II; Table 14.48-II note 8; 14.38.015 |
| Long subdivision (formal or long plat) LSMC 14.18.025(a); Table 14.16A-I | H | 10 or more LSMC 14.18.010; 14.08.010 | — | Minimum frontage 20 ft LSMC Table 14.48-II; Table 14.48-II note 8; 14.38.015 |
| Binding Site Plans LSMC 14.18.110; Table 14.16A-I | A7 | Maximum lots Not set LSMC 14.18.105 |
— | Minimum lot size Not set LSMC 14.18.105 |
✓ By right A Administrative review H Public hearing — Not allowed
Conditions
- The apartment is above a permitted nonresidential use
- All of these are true:
- The encampment is sponsored by an established religious organization and located on the sponsor's property
- Another temporary encampment is operating in the City, or fewer than 275 days have passed since the last one
- The project obtains a conditional use permit for a height increase up to 80 feet
- None of these is true:
- The project obtains a conditional use permit for a height increase up to 80 feet
- The lot is within one-half mile walking distance of a major transit stop
- None of these is true:
- The lot is within one-half mile walking distance of a major transit stop
- Any of these is true:
- The division subjects the land to the Horizontal Property Regimes Act or the Condominium Act (condominium units)
- The commercial or industrial zoned land is divided for sale or lease for commercial or industrial purposes, or leased as a mobile home park