I1 · Industrial 1
Lakewood, WA · LMC 18A.60.050 · Official code
By right: nothing · ADU not by right
1. What you can build
| 1 unit | 2 units | 3 units | 4+ units | Group living | |
|---|---|---|---|---|---|
| Live/work and work/live units | HomeH ADU— | HomeH ADU— | HomeH ADU— | HomeH ADU— | — |
✓ By right A Administrative review H Public hearing — Not allowed HOME = the main building n Only under condition n
2. Lot standards
3. Building standards
| Standard | Value | Exceptions |
|---|---|---|
| Front setback | ||
| Side setback | ||
| Street side setback | ||
| Rear setback | ||
| Maximum height | ||
| Maximum lot coverage | 100% LMC 18A.60.050(A) | |
| Maximum impervious surface | 100% LMC 18A.60.050(A) | |
| Minimum parking | For conditional uses, as identified and described in Chapter 18A.20 LMC, Article II, the parking requirement shall be as provided in that chapter or as determined by the Hearing Examiner. LMC 18A.80.030(B) |
4. ADU standards
Lot
No standards.
Building
No standards.
5. Dividing land
| Division | Approval | Lots | Density | Each new lot |
|---|---|---|---|---|
| Short subdivision LMC 17.22.070(A) | A | up to 9 LMC 17.02.035 | — | Minimum lot size 20,000 sq ft LMC 18A.60.050(A) Minimum lot width 50 ft LMC 18A.60.090(A)(4) |
| Subdivision LMC 17.14.010 | H | 10 or more LMC 17.02.035; 17.10.020(A) | — | Minimum lot size 20,000 sq ft LMC 18A.60.050(A) Minimum lot width 50 ft LMC 18A.60.090(A)(4) |
| Plats with private streets LMC 17.26.010; 17.26.020; 17.22.070(A) | A | up to 9 LMC 17.26.020; 17.02.035 | — | Minimum lot size 20,000 sq ft LMC 18A.60.050(A) Minimum lot width 50 ft LMC 18A.60.090(A)(4) |
| Plats with private streets LMC 17.26.010; 17.26.020; 17.14.010 | H | 10 or more LMC 17.26.020; 17.02.035 | — | Minimum lot size 20,000 sq ft LMC 18A.60.050(A) Minimum lot width 50 ft LMC 18A.60.090(A)(4) |
| Unit lot subdivision LMC 17.24.020(A); 17.24.020(D)-(E) | — | — | — | — |
| Binding site plan LMC 17.30.045(A) | A | 2 or more LMC 17.30.020(A) | — | Minimum lot size 20,000 sq ft LMC 18A.60.050(A) |
✓ By right A Administrative review H Public hearing — Not allowed
Conditions
- Lot is a flag lot
- None of these is true:
- Lot is a flag lot
- All of these are true:
- Lot is a flag lot
- The lot line abuts a principal arterial or state highway
- All of these are true:
- Lot is a flag lot
- The lot line abuts a principal arterial or state highway
- All of these are true:
- The lot line abuts a principal arterial or state highway
- Lot is a flag lot
- None of these is true:
- Lot is a flag lot
- The lot line abuts a principal arterial or state highway
- The portion of the building is within a building transition area along a property line abutting an R1, R2, R3, R4, MR1 or MR2 zone
- None of these is true:
- The portion of the building is within a building transition area along a property line abutting an R1, R2, R3, R4, MR1 or MR2 zone