I · Industrial

Olympia, WA · OMC 18.08 · Official code

By right: nothing · ADU not by right

1. What you can build

1 unit2 units3 units4+ unitsGroup living
Secure Community Transition Facilities————
HomeH ADU—

✓ By right   A Administrative review   H Public hearing   — Not allowed   HOME = the main building   n Only under condition n

2. Lot standards

StandardValueExceptions
Minimum lot sizeNo limit OMC 18.08.100 Table 8.02 (I column)

3. Building standards

StandardValueExceptions
Front setbackNo limit OMC 18.08.100 Table 8.02 (I column)
Side setbackNo limit OMC 18.08.100 Table 8.02 (I column)
Rear setbackNo limit OMC 18.08.100 Table 8.02 (I column)
Maximum height
  • Buildings or structures may exceed height limits with a conditional use permit.1 OMC 18.08.100(B)(2)
  • 65 ft2 OMC 18.08.100 Table 8.02 (I column)
  • 50 ft3 OMC 18.08.100 Table 8.02 (I column)
Maximum lot coverage
  • 40%4 OMC 18.08.100(B)(2)(b)
  • Not set5 OMC 18.08.100 Table 8.02 (I column)
Maximum impervious surface100% OMC 18.08.100 Table 8.02 (I column)
Maximum floor area ratio1 OMC 18.08.100 Table 8.02 (I column)

4. ADU standards

Lot

No standards.

Building

No standards.

5. Dividing land

DivisionApprovalLotsDensityEach new lot
Short subdivision OMC 17.32.130(A); 18.70.040 A up to 9 OMC 17.12.010(EE); 17.32.010 —
Minimum lot size
No limit OMC 18.08.100 Table 8.02 (I column)
Subdivision OMC 17.16.080; 18.70.040 H 10 or more OMC 17.12.010(HH) —
Minimum lot size
No limit OMC 18.08.100 Table 8.02 (I column)
Unit Lot Subdivisions OMC 17.33.010(B)(1) — — — —
Binding Site Plans OMC 17.34.010; 17.34.070(A) A — —
Minimum lot size
No limit OMC 17.34.020
Large lot subdivision OMC 17.36.100(A) A 2 or more OMC 17.36.010 —
Minimum lot size
217,800 sq ft OMC 17.36.010

✓ By right   A Administrative review   H Public hearing   — Not allowed

Conditions

  1. The project gets a conditional use permit for a height of up to 50 feet
  2. All of these are true:
    • Site is one of the Port's peninsula industrial sites (Admiral, Ocean Terminal or Central District)
    None of these is true:
    • The project gets a conditional use permit for a height of up to 50 feet
  3. None of these is true:
    • The project gets a conditional use permit for a height of up to 50 feet
    • Site is one of the Port's peninsula industrial sites (Admiral, Ocean Terminal or Central District)
  4. Building height is more than 50
  5. Building height is at most 50