NB · Neighborhood Business
Shoreline, WA · SMC 20.40.040(A); 20.40.120; 20.50.020(A) · Official code
By right: 4+ units · ADU allowed by right
1. What you can build
| 1 unit | 2 units | 3 units | 4+ units | Group living | |
|---|---|---|---|---|---|
| Multifamily | — | — | — | Home✓ ADU✓ | — |
| Assisted Living Facility | — | — | — | — | Home✓ ADU✓ |
| Co-Living Housing | — | — | — | — | Home✓ ADU✓ |
| Dormitory | — | — | — | — | |
| Permanent Supportive and Transitional Housing | — | — | — | — |
✓ By right A Administrative review H Public hearing — Not allowed HOME = the main building n Only under condition n
2. Lot standards
No standards.
3. Building standards
4. ADU standards
Lot
| Standard | Value | Exceptions |
|---|---|---|
| Maximum units | 2 units SMC 20.40.210(A) |
Building
| Standard | Value | Exceptions |
|---|---|---|
| Front setback | ||
| Side setback | ||
| Rear setback | ||
| Maximum height | 50 ft SMC 20.50.020(A) | |
| Maximum unit size | ||
| Attached to the main house | Not required SMC 20.40.210(B) |
5. Dividing land
| Division | Approval | Lots | Density | Each new lot |
|---|---|---|---|---|
| Short Subdivision SMC 20.30.050; 20.30.410 | A | up to 9 SMC 20.30.380(A) | — | Minimum lot size Not set SMC 20.50.020(A) |
| Formal Subdivision SMC 20.30.060; 20.30.410 | H | 10 or more SMC 20.30.380(B) | — | Minimum lot size Not set SMC 20.50.020(A) |
| Unit Lot Subdivision SMC 20.30.410(B)(4)(b) | A | 2 or more SMC 20.20.050 | — | Minimum lot size Not set SMC 20.30.410(B)(4); 20.50.020(A) |
| Binding Site Plan SMC 20.30.050; 20.30.480(A) | A10 | — | — | Minimum lot size Not set SMC 20.30.480 |
✓ By right A Administrative review H Public hearing — Not allowed
Conditions
- The dormitory is accessory to a school, college, university or church
- Operated by a public agency, a Washington registered nonprofit corporation, or a federally recognized tax exempt 501(c)(3) organization
- Not all of these are true:
- The front yard is in a transition area (SMC 20.50.021(A))
- None of these is true:
- The front right-of-way is classified as a principal arterial
- None of these is true:
- The NR zone across the transition area has the Comprehensive Plan designation of Public Open Space
- All of these are true:
- The front yard is in a transition area (SMC 20.50.021(A))
- The front right-of-way is classified as a principal arterial
- The NR zone across the transition area has the Comprehensive Plan designation of Public Open Space
- The zone of the lot abutting the side or rear lot line is commercial_or_mur70
- The zone of the lot abutting the side or rear lot line is nr3_or_nr2
- The zone of the lot abutting the side or rear lot line is tc4_nr1_mur35_mur45
- None of these is true:
- The ADU is interior to the residence, on a separate floor, and shares a common roof with the primary residence
- The ADU is interior to the residence, on a separate floor, and shares a common roof with the primary residence
- The land division is for a commercial, industrial, or mixed use type of development