Sign in

CRC · Clearview Rural Commercial

Snohomish County, WA · SCC 30.31F; 30.22.110; 30.23.030 · Official code

By right: 1 unit · ADU allowed by right

1. What you can build

1 unit2 units3 units4+ unitsGroup living
Dwelling, Single Family
Home✓ ADU✓
————
Dwelling, Mobile Home
Home✓ ADU✓
————
Temporary Dwelling During Construction
HomeA1 ADU—
————
Community Facilities for Juveniles————
Home✓2 ✓3 ADU—
Health and Social Service Facilities, Level I————
Home✓ ADU✓
Emergency Shelter, Religious-Owned Property————
Home✓4 ADU—

✓ By right   A Administrative review   H Public hearing   — Not allowed   HOME = the main building   n Only under condition n

2. Lot standards

StandardValueExceptions
Minimum lot sizeNo limit SCC 30.23.030
Minimum lot widthNo limit SCC 30.23.030
Maximum residentsNot set SCC 30.23.030
8 persons SCC 30.22.100; 30.22.110; 30.22.120
for Community Facilities for Juveniles (group living)2
24 persons SCC 30.22.100; 30.22.110; 30.22.120
for Community Facilities for Juveniles (group living)3

3. Building standards

StandardValueExceptions
Front setback
  • 25 ft5 SCC 30.23.043; 30.23.049(3)
  • 55 ft6 SCC 30.23.043; 30.23.049(4)
Side setback
  • 0 ft7 SCC 30.23.030
  • 25 ft8 SCC 30.23.030
  • 100 ft9 SCC 30.23.030; 30.32B.130(2)
  • 100 ft10 SCC 30.23.030; 30.32A.110(1)
  • 0 ft11 SCC 30.23.030
Street side setback
  • 25 ft5 SCC 30.23.043; 30.23.049(3)
  • 55 ft6 SCC 30.23.043; 30.23.049(4)
Rear setback
  • 0 ft7 SCC 30.23.030
  • 25 ft8 SCC 30.23.030
  • 100 ft9 SCC 30.23.030; 30.32B.130(2)
  • 100 ft10 SCC 30.23.030; 30.32A.110(1)
  • 0 ft11 SCC 30.23.030
Maximum height35 ft SCC 30.23.030
Maximum lot coverage
  • 50%12 SCC 30.23.030; 30.23.040(44)
  • 30%13 SCC 30.23.030; 30.23.040(45)
Maximum impervious surfaceThe total impervious surface on site shall be limited by the requirements of the county health department related to septic drain field development SCC 30.31F.140(1)
Minimum parkingWhere the parking requirements for a use are not specifically defined in SCC Table 30.26.030(1), the department shall determine the parking requirements for the use. SCC 30.26.030; 30.26.035
2 spaces per unit SCC 30.26.030
for Dwelling, Single Family (1 unit); Dwelling, Mobile Home (1 unit)
1 space per unit SCC 30.26.030
for Temporary Dwelling During Construction (1 unit)1

4. ADU standards

Lot

StandardValueExceptions
Maximum units1 unit SCC 30.28.010(3)(a)

Building

StandardValueExceptions
Front setback
  • 25 ft5 SCC 30.23.043; 30.23.049(3)
  • 55 ft6 SCC 30.23.043; 30.23.049(4)
Side setback
  • 0 ft7 SCC 30.23.030
  • 25 ft8 SCC 30.23.030
  • 100 ft9 SCC 30.23.030; 30.32B.130(2)
  • 100 ft10 SCC 30.23.030; 30.32A.110(1)
  • 0 ft11 SCC 30.23.030
Rear setback
  • 0 ft7 SCC 30.23.030
  • 25 ft8 SCC 30.23.030
  • 100 ft9 SCC 30.23.030; 30.32B.130(2)
  • 100 ft10 SCC 30.23.030; 30.32A.110(1)
  • 0 ft11 SCC 30.23.030
Maximum height35 ft SCC 30.23.030
Minimum parking1 space per unit SCC 30.26.030; 30.28.010(1)(f)
Maximum unit size1,200 sq ft SCC 30.28.010(1)(e)
Attached to the main houseNot required SCC 30.28.010(3)(a)

5. Dividing land

DivisionApprovalLotsDensityEach new lot
Short subdivision SCC 30.41B.030(1); 30.70.025 A14 up to 4 SCC 30.91S.280; 30.41B.010(1)(a) —
Minimum lot size
No limit SCC 30.23.030
Short subdivision SCC 30.41B.030(1); 30.70.025 H15 up to 4 SCC 30.91S.280; 30.41B.010(1)(a) —
Minimum lot size
No limit SCC 30.23.030
Subdivision SCC 30.41A.040(1); 30.70.025 H 5 or more SCC 30.91S.710; 30.41A.010(1)(a) —
Minimum lot size
No limit SCC 30.23.030
Binding site plan SCC 30.41D.010(2); 30.31F.210; 30.70.025 A16
Maximum lots
Not set SCC 30.41D.010
—
Minimum lot size
Not set SCC 30.41D.010

✓ By right   A Administrative review   H Public hearing   — Not allowed

Conditions

  1. The housing is for employees of an isolated industrial, mining, highway, or utilities construction project, who occupy it on a seasonal basis for 180 days or less in any 12-month period
  2. Residents is at most 8
  3. Residents is at least 9
  4. The property is owned or controlled by a religious organization (as defined in RCW 36.01.290)
  5. Not all of these are true:
    • The road network element in front of the lot is a public road
    • Width of the street right-of-way in front of the lot is less than 60
    • None of these is true:
      • The road in front of the lot is recorded in a subdivision, short subdivision, or binding site plan
  6. All of these are true:
    • The road network element in front of the lot is a public road
    • Width of the street right-of-way in front of the lot is less than 60
    None of these is true:
    • The road in front of the lot is recorded in a subdivision, short subdivision, or binding site plan
  7. What lies beyond the side or rear lot line being measured: a commercial or industrial zone (RB, CRC and RFS count as commercial and RI as industrial), an R-9,600, R-8,400 or R-7,200 zone, another urban residential zone (T, LDMR, MR, MHP), a rural zone, an Other-category zone (SA-1, RC, RU, R-20,000, R-12,500, WFB), designated farmland, designated forest land, or a water body; designated farmland or forest land is chosen over the zone is commercial_industrial_zone
  8. What lies beyond the side or rear lot line being measured: a commercial or industrial zone (RB, CRC and RFS count as commercial and RI as industrial), an R-9,600, R-8,400 or R-7,200 zone, another urban residential zone (T, LDMR, MR, MHP), a rural zone, an Other-category zone (SA-1, RC, RU, R-20,000, R-12,500, WFB), designated farmland, designated forest land, or a water body; designated farmland or forest land is chosen over the zone is one of r_single_family_zone, other_urban_residential_zone, rural_zone, other_zone
  9. What lies beyond the side or rear lot line being measured: a commercial or industrial zone (RB, CRC and RFS count as commercial and RI as industrial), an R-9,600, R-8,400 or R-7,200 zone, another urban residential zone (T, LDMR, MR, MHP), a rural zone, an Other-category zone (SA-1, RC, RU, R-20,000, R-12,500, WFB), designated farmland, designated forest land, or a water body; designated farmland or forest land is chosen over the zone is designated_farmland
  10. What lies beyond the side or rear lot line being measured: a commercial or industrial zone (RB, CRC and RFS count as commercial and RI as industrial), an R-9,600, R-8,400 or R-7,200 zone, another urban residential zone (T, LDMR, MR, MHP), a rural zone, an Other-category zone (SA-1, RC, RU, R-20,000, R-12,500, WFB), designated farmland, designated forest land, or a water body; designated farmland or forest land is chosen over the zone is designated_forest_land
  11. What lies beyond the side or rear lot line being measured: a commercial or industrial zone (RB, CRC and RFS count as commercial and RI as industrial), an R-9,600, R-8,400 or R-7,200 zone, another urban residential zone (T, LDMR, MR, MHP), a rural zone, an Other-category zone (SA-1, RC, RU, R-20,000, R-12,500, WFB), designated farmland, designated forest land, or a water body; designated farmland or forest land is chosen over the zone is water_body
  12. Which part of the Clearview Rural Commercial area the site is in: centered at 180th Street SE and SR 9, or centered at SR 9 and 164th Street SE is sr9_180th
  13. Which part of the Clearview Rural Commercial area the site is in: centered at 180th Street SE and SR 9, or centered at SR 9 and 164th Street SE is sr9_164th
  14. None of these is true:
    • The short subdivision proposes a new public road or public road extension
  15. The short subdivision proposes a new public road or public road extension
  16. What the binding site plan divides the land for: sale or lease of commercial or industrial zoned land used for commercial or industrial purposes; lease as a mobile home park or recreational vehicle park; a condominium or horizontal property regime; special purpose tracts of a PRD; or other (for example commercial or industrial zoned land used only for residential purposes) is one of commercial_industrial_use, mobile_home_or_rv_park_lease, condominium