Sign in

R-5 · Rural 5-Acre

Snohomish County, WA · SCC 30.21.025(2)(c); 30.22.110; 30.23.030 · Official code

By right: 1 unit, 2 units · ADU not by right

1. What you can build

1 unit2 units3 units4+ unitsGroup living
Dwelling, Single Family
Home✓ ADU✓1 ✓2
————
Dwelling, Mobile Home
Home✓ ADU✓1 ✓2
————
Temporary Dwelling During Construction
HomeA3 ADU—
————
Temporary Dwelling for Relative
HomeA4 ADU—
————
Dwelling, Duplex—
Home✓ ADU—
———
Boarding House————
Home✓5 ADU—
Community Facilities for Juveniles————
Home✓6 H7 ADU—
Foster Home————
Home✓ ADU✓1 ✓2
Health and Social Service Facilities, Level I————
Home✓5 ADU✓8 ✓9
Health and Social Service Facilities, Level II————
HomeH10 ADU—
Emergency Shelter, Religious-Owned Property————
Home✓11 ADU—

✓ By right   A Administrative review   H Public hearing   — Not allowed   HOME = the main building   n Only under condition n

2. Lot standards

StandardValueExceptions
Minimum lot size200,000 sq ft SCC 30.23.030; 30.23.040(2)
Minimum lot width165 ft SCC 30.23.030
Maximum residentsNot set SCC 30.23.030
2 persons SCC 30.22.130(15)
for Boarding House (group living)5
8 persons SCC 30.22.100; 30.22.110; 30.22.120
for Community Facilities for Juveniles (group living)6
24 persons SCC 30.22.100; 30.22.110; 30.22.120
for Community Facilities for Juveniles (group living)7
  • 6 persons12 SCC 30.91F.500
  • 3 persons13 SCC 30.91F.500
for Foster Home (group living)

3. Building standards

StandardValueExceptions
Front setback
  • 20 ft14 SCC 30.23.043; 30.23.049(3)
  • 50 ft15 SCC 30.23.043; 30.23.049(4)
  • 30 ft14 SCC 30.23.043; 30.23.049(3); 30.23.110(10)
  • 50 ft15 SCC 30.23.043; 30.23.049(4)
for Health and Social Service Facilities, Level II (group living)10
Side setback
  • 5 ft16 SCC 30.23.030
  • 100 ft17 SCC 30.23.030; 30.32B.130(2)
  • 100 ft18 SCC 30.23.030; 30.32A.110(1)
  • 25 ft19 SCC 30.23.030; 30.23.040(12)
  • 30 ft16 SCC 30.23.030; 30.23.110(10)
  • 100 ft17 SCC 30.23.030; 30.32B.130(2)
  • 100 ft18 SCC 30.23.030; 30.32A.110(1)
  • 30 ft19 SCC 30.23.030; 30.23.040(12); 30.23.110(10)
for Health and Social Service Facilities, Level II (group living)10
Street side setback
  • 20 ft14 SCC 30.23.043; 30.23.049(3)
  • 50 ft15 SCC 30.23.043; 30.23.049(4)
  • 30 ft14 SCC 30.23.043; 30.23.049(3); 30.23.110(10)
  • 50 ft15 SCC 30.23.043; 30.23.049(4)
for Health and Social Service Facilities, Level II (group living)10
Rear setback
  • 5 ft16 SCC 30.23.030
  • 100 ft17 SCC 30.23.030; 30.32B.130(2)
  • 100 ft18 SCC 30.23.030; 30.32A.110(1)
  • 25 ft19 SCC 30.23.030; 30.23.040(12)
  • 30 ft16 SCC 30.23.030; 30.23.110(10)
  • 100 ft17 SCC 30.23.030; 30.32B.130(2)
  • 100 ft18 SCC 30.23.030; 30.32A.110(1)
  • 30 ft19 SCC 30.23.030; 30.23.040(12); 30.23.110(10)
for Health and Social Service Facilities, Level II (group living)10
Building separationNot set SCC 30.23.030
20 ft SCC 30.22.130(18)(f)
for Temporary Dwelling for Relative (1 unit)4
Maximum height45 ft SCC 30.23.030
Maximum lot coverage35% SCC 30.23.030
Minimum parkingWhere the parking requirements for a use are not specifically defined in SCC Table 30.26.030(1), the department shall determine the parking requirements for the use. SCC 30.26.030; 30.26.035
2 spaces per unit SCC 30.26.030
for Dwelling, Single Family (1 unit); Dwelling, Mobile Home (1 unit); Dwelling, Duplex (2 units)
1 space per unit SCC 30.26.030
for Temporary Dwelling During Construction (1 unit)3; Temporary Dwelling for Relative (1 unit)4
1 space per sleeping unit SCC 30.26.030
for Boarding House (group living)5

4. ADU standards

Lot

StandardValueExceptions
Maximum units1 unit SCC 30.28.010(3)(a)

Building

StandardValueExceptions
Front setback
  • 20 ft14 SCC 30.23.043; 30.23.049(3)
  • 50 ft15 SCC 30.23.043; 30.23.049(4)
Side setback
  • 5 ft16 SCC 30.23.030
  • 100 ft17 SCC 30.23.030; 30.32B.130(2)
  • 100 ft18 SCC 30.23.030; 30.32A.110(1)
  • 25 ft19 SCC 30.23.030; 30.23.040(12)
Rear setback
  • 5 ft16 SCC 30.23.030
  • 100 ft17 SCC 30.23.030; 30.32B.130(2)
  • 100 ft18 SCC 30.23.030; 30.32A.110(1)
  • 25 ft19 SCC 30.23.030; 30.23.040(12)
Maximum height45 ft SCC 30.23.030
Minimum parking1 space per unit SCC 30.26.030; 30.28.010(1)(f)
Maximum unit size1,200 sq ft SCC 30.28.010(1)(e)
Attached to the main houseRequired SCC 30.28.010(3)(a)(i)(A)
Not required SCC 30.28.010(3)(a)(i)(A)
for Dwelling, Single Family (1 unit)2; Dwelling, Mobile Home (1 unit)2; Foster Home (group living)2; Health and Social Service Facilities, Level I (group living)9

5. Dividing land

DivisionApprovalLotsDensityEach new lot
Short subdivision SCC 30.41B.030(1); 30.70.025 A20 up to 4 SCC 30.91S.280; 30.41B.010(1)(a) —
Minimum lot size
200,000 sq ft SCC 30.23.030; 30.23.040(2)
Minimum lot width
165 ft SCC 30.23.030
Short subdivision SCC 30.41B.030(1); 30.70.025 H21 up to 4 SCC 30.91S.280; 30.41B.010(1)(a) —
Minimum lot size
200,000 sq ft SCC 30.23.030; 30.23.040(2)
Minimum lot width
165 ft SCC 30.23.030
Subdivision SCC 30.41A.040(1); 30.70.025 H22 5 or more SCC 30.91S.710; 30.41A.010(1)(a) —
Minimum lot size
200,000 sq ft SCC 30.23.030; 30.23.040(2)
Minimum lot width
165 ft SCC 30.23.030
Rural cluster subdivision SCC 30.41C.030(1); 30.41B.030(1); 30.70.025 A23
Maximum lots
  • the smallest of 4, (lot area ÷ (the largest of 200,000, 200,000)) × 1.15, rounded lots24 SCC 30.41C.230(1)-(2); 30.41C.230(4); 30.41C.240(1); 30.91S.280
  • the smallest of 4, (lot area ÷ (the largest of 200,000, 200,000)) × 1.05, rounded lots25 SCC 30.41C.230(1)-(2); 30.41C.230(4); 30.41C.240(2); 30.91S.280
  • the smallest of 4, (lot area ÷ (the largest of 200,000, 200,000)) × 1, rounded lots26 SCC 30.41C.230(1)-(2); 30.41C.230(4); 30.41C.240(3); 30.91S.280
—
Minimum lot size
20,000 sq ft SCC 30.41C.130
Minimum lot width
125 ft SCC 30.41C.130
Rural cluster subdivision SCC 30.41C.030(1); 30.41B.030(1); 30.70.025 H27
Maximum lots
  • the smallest of 4, (lot area ÷ (the largest of 200,000, 200,000)) × 1.15, rounded lots24 SCC 30.41C.230(1)-(2); 30.41C.230(4); 30.41C.240(1); 30.91S.280
  • the smallest of 4, (lot area ÷ (the largest of 200,000, 200,000)) × 1.05, rounded lots25 SCC 30.41C.230(1)-(2); 30.41C.230(4); 30.41C.240(2); 30.91S.280
  • the smallest of 4, (lot area ÷ (the largest of 200,000, 200,000)) × 1, rounded lots26 SCC 30.41C.230(1)-(2); 30.41C.230(4); 30.41C.240(3); 30.91S.280
—
Minimum lot size
20,000 sq ft SCC 30.41C.130
Minimum lot width
125 ft SCC 30.41C.130
Rural cluster subdivision SCC 30.41C.030(1); 30.41A.040(1); 30.70.025 H28
Minimum lots
5 lots SCC 30.91S.710
Maximum lots
  • (lot area ÷ (the largest of 200,000, 200,000)) × 1.15, rounded lots24 SCC 30.41C.230(1)-(2); 30.41C.230(4); 30.41C.240(1); 30.91S.280
  • (lot area ÷ (the largest of 200,000, 200,000)) × 1.05, rounded lots25 SCC 30.41C.230(1)-(2); 30.41C.230(4); 30.41C.240(2); 30.91S.280
  • (lot area ÷ (the largest of 200,000, 200,000)) × 1, rounded lots26 SCC 30.41C.230(1)-(2); 30.41C.230(4); 30.41C.240(3); 30.91S.280
—
Minimum lot size
20,000 sq ft SCC 30.41C.130
Minimum lot width
125 ft SCC 30.41C.130
Rural cluster subdivision SCC 30.41C.030(1); 30.41B.030(1); 30.70.025 A29
Maximum lots
  • the smallest of 4, (lot area ÷ (the largest of 200,000, 200,000)) × 1.15, rounded lots24 SCC 30.41C.230(1)-(2); 30.41C.230(4); 30.41C.240(1); 30.91S.280
  • the smallest of 4, (lot area ÷ (the largest of 200,000, 200,000)) × 1.05, rounded lots25 SCC 30.41C.230(1)-(2); 30.41C.230(4); 30.41C.240(2); 30.91S.280
  • the smallest of 4, (lot area ÷ (the largest of 200,000, 200,000)) × 1, rounded lots26 SCC 30.41C.230(1)-(2); 30.41C.230(4); 30.41C.240(3); 30.91S.280
Minimum average lot size
7,200 sq ft SCC 30.23.220(1); 30.41C.140(2)
Maximum lot size
20,000 sq ft SCC 30.41C.140(2); 30.23.040(24)
Minimum frontage
80 ft SCC 30.41C.140(2)
Rural cluster subdivision SCC 30.41C.030(1); 30.41B.030(1); 30.70.025 H30
Maximum lots
  • the smallest of 4, (lot area ÷ (the largest of 200,000, 200,000)) × 1.15, rounded lots24 SCC 30.41C.230(1)-(2); 30.41C.230(4); 30.41C.240(1); 30.91S.280
  • the smallest of 4, (lot area ÷ (the largest of 200,000, 200,000)) × 1.05, rounded lots25 SCC 30.41C.230(1)-(2); 30.41C.230(4); 30.41C.240(2); 30.91S.280
  • the smallest of 4, (lot area ÷ (the largest of 200,000, 200,000)) × 1, rounded lots26 SCC 30.41C.230(1)-(2); 30.41C.230(4); 30.41C.240(3); 30.91S.280
Minimum average lot size
7,200 sq ft SCC 30.23.220(1); 30.41C.140(2)
Maximum lot size
20,000 sq ft SCC 30.41C.140(2); 30.23.040(24)
Minimum frontage
80 ft SCC 30.41C.140(2)
Rural cluster subdivision SCC 30.41C.030(1); 30.41A.040(1); 30.70.025 H31
Minimum lots
5 lots SCC 30.91S.710
Maximum lots
  • (lot area ÷ (the largest of 200,000, 200,000)) × 1.15, rounded lots24 SCC 30.41C.230(1)-(2); 30.41C.230(4); 30.41C.240(1); 30.91S.280
  • (lot area ÷ (the largest of 200,000, 200,000)) × 1.05, rounded lots25 SCC 30.41C.230(1)-(2); 30.41C.230(4); 30.41C.240(2); 30.91S.280
  • (lot area ÷ (the largest of 200,000, 200,000)) × 1, rounded lots26 SCC 30.41C.230(1)-(2); 30.41C.230(4); 30.41C.240(3); 30.91S.280
Minimum average lot size
7,200 sq ft SCC 30.23.220(1); 30.41C.140(2)
Maximum lot size
20,000 sq ft SCC 30.41C.140(2); 30.23.040(24)
Minimum frontage
80 ft SCC 30.41C.140(2)
Lot size averaging - F&R, R-5, and RD zoning SCC 30.23.215; 30.41B.030(1); 30.70.025 A20 up to 4 SCC 30.91S.280
Minimum average lot size
200,000 sq ft SCC 30.23.215(1)-(2)
Minimum lot size
Each single lot shall be at least 12,500 square feet in area or the minimum area necessary to comply with the county health department rules and regulations for on-site sewage disposal and potable water supply, whichever is greater SCC 30.23.215(4)(a)
Minimum lot width
75 ft SCC 30.23.215(4)(b)(i)
Lot size averaging - F&R, R-5, and RD zoning SCC 30.23.215; 30.41B.030(1); 30.70.025 H21 up to 4 SCC 30.91S.280
Minimum average lot size
200,000 sq ft SCC 30.23.215(1)-(2)
Minimum lot size
Each single lot shall be at least 12,500 square feet in area or the minimum area necessary to comply with the county health department rules and regulations for on-site sewage disposal and potable water supply, whichever is greater SCC 30.23.215(4)(a)
Minimum lot width
75 ft SCC 30.23.215(4)(b)(i)
Homestead parcel SCC 30.22.110; 30.22.130(40); 30.28.055(6); 30.22.130(115) H32 up to 2 SCC 30.28.055(2); 30.28.055(4) —
Minimum lot size
The resultant non-homestead parcel shall not be less than the minimum lot area permitted in the zone SCC 30.28.055(2)
Maximum lot size
The homestead parcel shall include no more than two acres of land, unless soil conditions, topography, or other unique circumstances require a greater land area SCC 30.28.055(4)
Binding site plan SCC 30.41D.010(2); 30.70.025 A33
Maximum lots
Not set SCC 30.41D.010
—
Minimum lot size
Not set SCC 30.41D.010

✓ By right   A Administrative review   H Public hearing   — Not allowed

Conditions

  1. Lot area is less than 217,800 sf
  2. Lot area is at least 217,800 sf
  3. The housing is for employees of an isolated industrial, mining, highway, or utilities construction project, who occupy it on a seasonal basis for 180 days or less in any 12-month period
  4. All of these are true:
    • A permanent dwelling (existing residence) is on the same lot
    • The temporary dwelling is occupied only by a relative, by blood or marriage, of the occupant(s) of the permanent dwelling
    • The relative receives from, or administers to, the occupant of the other dwelling continuous care and assistance necessitated by advanced age or infirmity
    • The need for continuous care and assistance is attested to in writing by a licensed physician
    None of these is true:
    • The temporary dwelling is used as a commercial rental unit
    • A detached accessory dwelling unit is located on the lot
  5. None of these is true:
    • Lot in the Mineral Resource Overlay (MRO)
  6. All of these are true:
    • Located within one mile of an active public transportation route at the time of permitting
    • Residents is at most 8
    None of these is true:
    • Lot in the Mineral Resource Overlay (MRO)
  7. All of these are true:
    • Residents is at least 9
    None of these is true:
    • Lot in the Mineral Resource Overlay (MRO)
  8. All of these are true:
    • Lot area is less than 217,800 sf
    None of these is true:
    • Lot in the Mineral Resource Overlay (MRO)
  9. All of these are true:
    • Lot area is at least 217,800 sf
    None of these is true:
    • Lot in the Mineral Resource Overlay (MRO)
  10. None of these is true:
    • Lot in the Mineral Resource Overlay (MRO)
    • The use is served by public sewer
  11. The property is owned or controlled by a religious organization (as defined in RCW 36.01.290)
  12. None of these is true:
    • The foster home cares for expectant mothers rather than foster children
  13. The foster home cares for expectant mothers rather than foster children
  14. Not all of these are true:
    • The road network element in front of the lot is a public road
    • Width of the street right-of-way in front of the lot is less than 60
    • None of these is true:
      • The road in front of the lot is recorded in a subdivision, short subdivision, or binding site plan
  15. All of these are true:
    • The road network element in front of the lot is a public road
    • Width of the street right-of-way in front of the lot is less than 60
    None of these is true:
    • The road in front of the lot is recorded in a subdivision, short subdivision, or binding site plan
  16. What lies beyond the side or rear lot line being measured: a commercial or industrial zone (RB, CRC and RFS count as commercial and RI as industrial), an R-9,600, R-8,400 or R-7,200 zone, another urban residential zone (T, LDMR, MR, MHP), a rural zone, an Other-category zone (SA-1, RC, RU, R-20,000, R-12,500, WFB), designated farmland, designated forest land, or a water body; designated farmland or forest land is chosen over the zone is one of commercial_industrial_zone, r_single_family_zone, other_urban_residential_zone, rural_zone, other_zone
  17. What lies beyond the side or rear lot line being measured: a commercial or industrial zone (RB, CRC and RFS count as commercial and RI as industrial), an R-9,600, R-8,400 or R-7,200 zone, another urban residential zone (T, LDMR, MR, MHP), a rural zone, an Other-category zone (SA-1, RC, RU, R-20,000, R-12,500, WFB), designated farmland, designated forest land, or a water body; designated farmland or forest land is chosen over the zone is designated_farmland
  18. What lies beyond the side or rear lot line being measured: a commercial or industrial zone (RB, CRC and RFS count as commercial and RI as industrial), an R-9,600, R-8,400 or R-7,200 zone, another urban residential zone (T, LDMR, MR, MHP), a rural zone, an Other-category zone (SA-1, RC, RU, R-20,000, R-12,500, WFB), designated farmland, designated forest land, or a water body; designated farmland or forest land is chosen over the zone is designated_forest_land
  19. What lies beyond the side or rear lot line being measured: a commercial or industrial zone (RB, CRC and RFS count as commercial and RI as industrial), an R-9,600, R-8,400 or R-7,200 zone, another urban residential zone (T, LDMR, MR, MHP), a rural zone, an Other-category zone (SA-1, RC, RU, R-20,000, R-12,500, WFB), designated farmland, designated forest land, or a water body; designated farmland or forest land is chosen over the zone is water_body
  20. All of these are true:
    • The Future Land Use Map designation of the property is not commercial_forest
    None of these is true:
    • The short subdivision proposes a new public road or public road extension
  21. All of these are true:
    • The Future Land Use Map designation of the property is not commercial_forest
    • The short subdivision proposes a new public road or public road extension
  22. The Future Land Use Map designation of the property is not commercial_forest
  23. All of these are true:
    • The Future Land Use Map designation of the property is not commercial_forest
    None of these is true:
    • The Future Land Use Map designation of the property is one of commercial_forest, commercial_forest_transition, upland_commercial_farmland, local_commercial_farmland, riverway_commercial_farmland
    • All of these are true:
      • The Future Land Use Map designation of the property is rural_residential_rd
      • None of these is true:
        • Site inside a Rural/Urban Transition Area (RUTA) on the Future Land Use Map
    • Land inside an urban growth area (UGA)
    • Site inside a Rural/Urban Transition Area (RUTA) on the Future Land Use Map
    • The short subdivision proposes a new public road or public road extension
  24. None of these is true:
    • The Future Land Use Map designation of the property is local_forest
    • Lot in the Mineral Resource Overlay (MRO)
    • All of these are true:
      • Site inside a Rural/Urban Transition Area (RUTA) on the Future Land Use Map
      • The Future Land Use Map designation of the property is rural_residential_rd
  25. All of these are true:
    • Any of these is true:
      • The Future Land Use Map designation of the property is local_forest
      • Lot in the Mineral Resource Overlay (MRO)
    • Not all of these are true:
      • Site inside a Rural/Urban Transition Area (RUTA) on the Future Land Use Map
      • The Future Land Use Map designation of the property is rural_residential_rd
  26. All of these are true:
    • Site inside a Rural/Urban Transition Area (RUTA) on the Future Land Use Map
    • The Future Land Use Map designation of the property is rural_residential_rd
  27. All of these are true:
    • The Future Land Use Map designation of the property is not commercial_forest
    • The short subdivision proposes a new public road or public road extension
    None of these is true:
    • The Future Land Use Map designation of the property is one of commercial_forest, commercial_forest_transition, upland_commercial_farmland, local_commercial_farmland, riverway_commercial_farmland
    • All of these are true:
      • The Future Land Use Map designation of the property is rural_residential_rd
      • None of these is true:
        • Site inside a Rural/Urban Transition Area (RUTA) on the Future Land Use Map
    • Land inside an urban growth area (UGA)
    • Site inside a Rural/Urban Transition Area (RUTA) on the Future Land Use Map
  28. All of these are true:
    • The Future Land Use Map designation of the property is not commercial_forest
    None of these is true:
    • The Future Land Use Map designation of the property is one of commercial_forest, commercial_forest_transition, upland_commercial_farmland, local_commercial_farmland, riverway_commercial_farmland
    • All of these are true:
      • The Future Land Use Map designation of the property is rural_residential_rd
      • None of these is true:
        • Site inside a Rural/Urban Transition Area (RUTA) on the Future Land Use Map
    • Land inside an urban growth area (UGA)
    • Site inside a Rural/Urban Transition Area (RUTA) on the Future Land Use Map
  29. All of these are true:
    • The Future Land Use Map designation of the property is not commercial_forest
    • Site inside a Rural/Urban Transition Area (RUTA) on the Future Land Use Map
    None of these is true:
    • The Future Land Use Map designation of the property is one of commercial_forest, commercial_forest_transition, upland_commercial_farmland, local_commercial_farmland, riverway_commercial_farmland
    • All of these are true:
      • The Future Land Use Map designation of the property is rural_residential_rd
      • None of these is true:
        • Site inside a Rural/Urban Transition Area (RUTA) on the Future Land Use Map
    • Land inside an urban growth area (UGA)
    • The short subdivision proposes a new public road or public road extension
  30. All of these are true:
    • The Future Land Use Map designation of the property is not commercial_forest
    • Site inside a Rural/Urban Transition Area (RUTA) on the Future Land Use Map
    • The short subdivision proposes a new public road or public road extension
    None of these is true:
    • The Future Land Use Map designation of the property is one of commercial_forest, commercial_forest_transition, upland_commercial_farmland, local_commercial_farmland, riverway_commercial_farmland
    • All of these are true:
      • The Future Land Use Map designation of the property is rural_residential_rd
      • None of these is true:
        • Site inside a Rural/Urban Transition Area (RUTA) on the Future Land Use Map
    • Land inside an urban growth area (UGA)
  31. All of these are true:
    • The Future Land Use Map designation of the property is not commercial_forest
    • Site inside a Rural/Urban Transition Area (RUTA) on the Future Land Use Map
    None of these is true:
    • The Future Land Use Map designation of the property is one of commercial_forest, commercial_forest_transition, upland_commercial_farmland, local_commercial_farmland, riverway_commercial_farmland
    • All of these are true:
      • The Future Land Use Map designation of the property is rural_residential_rd
      • None of these is true:
        • Site inside a Rural/Urban Transition Area (RUTA) on the Future Land Use Map
    • Land inside an urban growth area (UGA)
  32. All of these are true:
    • The parcel is designated as agricultural land of primary or secondary significance in the Snohomish County Agricultural Preservation Plan or as agriculture in an adopted subarea comprehensive plan
    • A dwelling currently exists on the parcel and existed before the effective date of the homestead parcel provisions
    None of these is true:
    • Lot in the Mineral Resource Overlay (MRO)
  33. What the binding site plan divides the land for: sale or lease of commercial or industrial zoned land used for commercial or industrial purposes; lease as a mobile home park or recreational vehicle park; a condominium or horizontal property regime; special purpose tracts of a PRD; or other (for example commercial or industrial zoned land used only for residential purposes) is one of mobile_home_or_rv_park_lease, condominium