RB · Rural Business
Snohomish County, WA · SCC 30.31F; 30.22.110; 30.23.030 · Official code
By right: nothing · ADU not by right
1. What you can build
| 1 unit | 2 units | 3 units | 4+ units | Group living | |
|---|---|---|---|---|---|
| Temporary Dwelling During Construction | — | — | — | — | |
| Community Facilities for Juveniles | — | — | — | — | |
| Foster Home | — | — | — | — | Home✓ ADU✓ |
| Health and Social Service Facilities, Level I | — | — | — | — | Home✓ ADU✓ |
| Health and Social Service Facilities, Level II | — | — | — | — | |
| Health and Social Service Facilities, Level III | — | — | — | — | Home✓ ADU— |
| Emergency Shelter, Religious-Owned Property | — | — | — | — |
✓ By right A Administrative review H Public hearing — Not allowed HOME = the main building n Only under condition n
2. Lot standards
| Standard | Value | Exceptions |
|---|---|---|
| Minimum lot size | No limit SCC 30.23.030 | |
| Minimum lot width | No limit SCC 30.23.030 | |
| Maximum residents | Not set SCC 30.23.030 | 8 persons SCC 30.22.100; 30.22.110; 30.22.120
for Community Facilities for Juveniles (group living)2 24 persons SCC 30.22.100; 30.22.110; 30.22.120
for Community Facilities for Juveniles (group living)3 |
3. Building standards
| Standard | Value | Exceptions |
|---|---|---|
| Front setback | ||
| Side setback | for Temporary Dwelling During Construction (1 unit)1; Foster Home (group living); Health and Social Service Facilities, Level I (group living) | |
| Street side setback | ||
| Rear setback | for Temporary Dwelling During Construction (1 unit)1; Foster Home (group living); Health and Social Service Facilities, Level I (group living) | |
| Maximum height | 35 ft SCC 30.23.030 | |
| Maximum lot coverage | 35% SCC 30.23.030 | |
| Maximum impervious surface | 50% SCC 30.31F.110(1)(a) | |
| Minimum parking | Where the parking requirements for a use are not specifically defined in SCC Table 30.26.030(1), the department shall determine the parking requirements for the use. SCC 30.26.030; 30.26.035 | 1 space per unit SCC 30.26.030
for Temporary Dwelling During Construction (1 unit)1 |
| Maximum building footprint | 4,000 sq ft SCC 30.31F.110(1)(b) |
4. ADU standards
Lot
| Standard | Value | Exceptions |
|---|---|---|
| Maximum units | 1 unit SCC 30.28.010(3)(a) |
Building
| Standard | Value | Exceptions |
|---|---|---|
| Front setback | ||
| Side setback | ||
| Rear setback | ||
| Maximum height | 35 ft SCC 30.23.030 | |
| Minimum parking | 1 space per unit SCC 30.26.030; 30.28.010(1)(f) | |
| Maximum unit size | 1,200 sq ft SCC 30.28.010(1)(e) | |
| Attached to the main house | Not required SCC 30.28.010(3)(a) |
5. Dividing land
| Division | Approval | Lots | Density | Each new lot |
|---|---|---|---|---|
| Short subdivision SCC 30.41B.030(1); 30.70.025 | A15 | up to 4 SCC 30.91S.280; 30.41B.010(1)(a) | — | Minimum lot size No limit SCC 30.23.030 |
| Short subdivision SCC 30.41B.030(1); 30.70.025 | H16 | up to 4 SCC 30.91S.280; 30.41B.010(1)(a) | — | Minimum lot size No limit SCC 30.23.030 |
| Subdivision SCC 30.41A.040(1); 30.70.025 | H | 5 or more SCC 30.91S.710; 30.41A.010(1)(a) | — | Minimum lot size No limit SCC 30.23.030 |
| Binding site plan SCC 30.41D.010(2); 30.31F.210; 30.70.025 | A17 | Maximum lots Not set SCC 30.41D.010 |
— | Minimum lot size Not set SCC 30.41D.010 |
✓ By right A Administrative review H Public hearing — Not allowed
Conditions
- The housing is for employees of an isolated industrial, mining, highway, or utilities construction project, who occupy it on a seasonal basis for 180 days or less in any 12-month period
- Residents is at most 8
- Residents is at least 9
- None of these is true:
- The use is served by public sewer
- The property is owned or controlled by a religious organization (as defined in RCW 36.01.290)
- None of these is true:
- The foster home cares for expectant mothers rather than foster children
- The foster home cares for expectant mothers rather than foster children
- Not all of these are true:
- The road network element in front of the lot is a public road
- Width of the street right-of-way in front of the lot is less than 60
- None of these is true:
- The road in front of the lot is recorded in a subdivision, short subdivision, or binding site plan
- All of these are true:
- The road network element in front of the lot is a public road
- Width of the street right-of-way in front of the lot is less than 60
- The road in front of the lot is recorded in a subdivision, short subdivision, or binding site plan
- What lies beyond the side or rear lot line being measured: a commercial or industrial zone (RB, CRC and RFS count as commercial and RI as industrial), an R-9,600, R-8,400 or R-7,200 zone, another urban residential zone (T, LDMR, MR, MHP), a rural zone, an Other-category zone (SA-1, RC, RU, R-20,000, R-12,500, WFB), designated farmland, designated forest land, or a water body; designated farmland or forest land is chosen over the zone is commercial_industrial_zone
- What lies beyond the side or rear lot line being measured: a commercial or industrial zone (RB, CRC and RFS count as commercial and RI as industrial), an R-9,600, R-8,400 or R-7,200 zone, another urban residential zone (T, LDMR, MR, MHP), a rural zone, an Other-category zone (SA-1, RC, RU, R-20,000, R-12,500, WFB), designated farmland, designated forest land, or a water body; designated farmland or forest land is chosen over the zone is one of r_single_family_zone, other_urban_residential_zone, rural_zone, other_zone
- What lies beyond the side or rear lot line being measured: a commercial or industrial zone (RB, CRC and RFS count as commercial and RI as industrial), an R-9,600, R-8,400 or R-7,200 zone, another urban residential zone (T, LDMR, MR, MHP), a rural zone, an Other-category zone (SA-1, RC, RU, R-20,000, R-12,500, WFB), designated farmland, designated forest land, or a water body; designated farmland or forest land is chosen over the zone is designated_farmland
- What lies beyond the side or rear lot line being measured: a commercial or industrial zone (RB, CRC and RFS count as commercial and RI as industrial), an R-9,600, R-8,400 or R-7,200 zone, another urban residential zone (T, LDMR, MR, MHP), a rural zone, an Other-category zone (SA-1, RC, RU, R-20,000, R-12,500, WFB), designated farmland, designated forest land, or a water body; designated farmland or forest land is chosen over the zone is designated_forest_land
- What lies beyond the side or rear lot line being measured: a commercial or industrial zone (RB, CRC and RFS count as commercial and RI as industrial), an R-9,600, R-8,400 or R-7,200 zone, another urban residential zone (T, LDMR, MR, MHP), a rural zone, an Other-category zone (SA-1, RC, RU, R-20,000, R-12,500, WFB), designated farmland, designated forest land, or a water body; designated farmland or forest land is chosen over the zone is water_body
- None of these is true:
- The short subdivision proposes a new public road or public road extension
- The short subdivision proposes a new public road or public road extension
- What the binding site plan divides the land for: sale or lease of commercial or industrial zoned land used for commercial or industrial purposes; lease as a mobile home park or recreational vehicle park; a condominium or horizontal property regime; special purpose tracts of a PRD; or other (for example commercial or industrial zoned land used only for residential purposes) is one of commercial_industrial_use, mobile_home_or_rv_park_lease, condominium