PI · PI (planned industrial) zoning district
Stanwood, WA · SMC 17.50; 17.30.080; 17.60.040 · Official code
By right: nothing · ADU not by right
1. What you can build
| 1 unit | 2 units | 3 units | 4+ units | Group living | |
|---|---|---|---|---|---|
| Mixed-Use | — | ||||
| Emergency Housing | — | — | — | — | Home✓ ADU— |
| Emergency Shelters | — | — | — | — | |
| Permanent Supportive Housing | — | — | — | — | Home✓ ADU— |
| Transitional Housing | — | — | — | — | Home✓ ADU— |
✓ By right A Administrative review H Public hearing — Not allowed HOME = the main building n Only under condition n
2. Lot standards
| Standard | Value | Exceptions |
|---|---|---|
| Minimum lot size | 20,000 sq ft SMC 18.402.040(1) | |
| Minimum lot width | No limit SMC 18.402.040(1) | |
| Minimum lot depth | No limit SMC 18.402.040(1) | |
| Minimum frontage | 20 ft SMC 17.20.020 | |
| Maximum density | See SMC 17.30.080 Footnote 5 SMC 18.402.040(1) | Not set SMC 18.402.040(1)
for Emergency Housing (group living); Emergency Shelters (group living)5; Permanent Supportive Housing (group living); Transitional Housing (group living) |
| Minimum development size | 217,800 sq ft SMC 17.30.080 note 5 | Not set SMC 18.402.040(1)
for Emergency Housing (group living); Emergency Shelters (group living)5; Permanent Supportive Housing (group living); Transitional Housing (group living) |
| Maximum residents | Not set SMC 18.402.040(1) |
3. Building standards
| Standard | Value | Exceptions |
|---|---|---|
| Front setback | 25 ft SMC 17.60.040(1) | |
| Side setback | 5 + (5 × (the largest of building stories − 2, 0)) ft SMC 17.60.040(1); 17.25.100(6) | |
| Street side setback | 5 ft SMC 17.60.040(1) | |
| Rear setback | 5 ft SMC 17.60.040(1) | |
| Building separation | More than one structure containing a permitted or permissible principal use may be erected on a single lot in conformance with the provisions of this code; provided, that required yard area, setbacks, lot area and other requirements of this code shall be met for each structure as though it were on an individual lot or as may be otherwise specified in this code. SMC 17.25.070 | |
| Maximum height | 35 ft SMC 17.60.040(1) | |
| Maximum lot coverage | 90% SMC 17.60.040(1) | |
| Minimum parking | Requirements for any use not specifically mentioned shall be the same as the use most similar to the one sought. In these instances, the planning director shall make this determination. SMC 17.105.140
for Emergency Housing (group living); Emergency Shelters (group living)5; Permanent Supportive Housing (group living); Transitional Housing (group living) |
4. ADU standards
Lot
No standards.
Building
No standards.
5. Dividing land
| Division | Approval | Lots | Density | Each new lot |
|---|---|---|---|---|
| Short subdivision SMC 18.400.020(1)(b); 18.230.020(5) | A | 2 to 9 SMC 18.102.200; SMC 18.400.020(1)(b) | See SMC 17.30.080 Footnote 5 SMC 18.402.040(1) | Minimum lot size 20,000 sq ft SMC 18.402.040(1) Minimum lot width No limit SMC 18.402.040(1) Minimum lot depth No limit SMC 18.402.040(1) |
| Long subdivision SMC 18.400.020(1)(c); 18.230.020(5) | H | 10 or more SMC 18.400.020(1)(c) | See SMC 17.30.080 Footnote 5 SMC 18.402.040(1) | Minimum lot size 20,000 sq ft SMC 18.402.040(1) Minimum lot width No limit SMC 18.402.040(1) Minimum lot depth No limit SMC 18.402.040(1) |
| Binding site plan SMC 18.408.010; 18.230.020(5) | A | up to 8 SMC 18.230.020(5) | — | Minimum lot size 20,000 sq ft SMC 18.402.040(1) Minimum lot width No limit SMC 18.402.040(1) Minimum lot depth No limit SMC 18.402.040(1) |
| Binding site plan SMC 18.408.010; 18.230.020(5) | H | 9 or more SMC 18.230.020(5) | — | Minimum lot size 20,000 sq ft SMC 18.402.040(1) Minimum lot width No limit SMC 18.402.040(1) Minimum lot depth No limit SMC 18.402.040(1) |
✓ By right A Administrative review H Public hearing — Not allowed
Conditions
- All of these are true:
- The project is part of a planned industrial park development under SMC 17.50.010
- All residential uses are located above commercial or industrial uses
- All of these are true:
- The project is part of a planned industrial park development under SMC 17.50.010
- All residential uses are located above commercial or industrial uses
- Main dwelling units on the lot is at most 9
- All of these are true:
- The project is part of a planned industrial park development under SMC 17.50.010
- All residential uses are located above commercial or industrial uses
- Main dwelling units on the lot is at least 10
- Main dwelling units on the lot is at most 60
- All of these are true:
- The project is part of a planned industrial park development under SMC 17.50.010
- All residential uses are located above commercial or industrial uses
- Main dwelling units on the lot is more than 60
- None of these is true:
- The site is within 1,200 feet, measured from property lines, of another special residential facility
- The home is on a local residential street
- None of these is true:
- The home is on a local residential street
- Bedrooms in one unit is at most 1
- All of these are true:
- Bedrooms in one unit is at least 2
- Bedrooms in one unit is less than 3
- Bedrooms in one unit is at least 3