S8 · S-8 Thea Foss Waterway Shoreline District
Tacoma, WA · TMC 19.09.100 · Official code
By right: nothing · ADU not by right
1. What you can build
| 1 unit | 2 units | 3 units | 4+ units | Group living | |
|---|---|---|---|---|---|
| Multifamily – stand alone | — | — | — | — | |
| Multifamily as part of a mix-use development | — | — | — | — |
✓ By right A Administrative review H Public hearing — Not allowed HOME = the main building n Only under condition n
2. Lot standards
| Standard | Value | Exceptions |
|---|---|---|
| Minimum units | 4 units TMC 19.10.010 |
3. Building standards
| Standard | Value | Exceptions |
|---|---|---|
| Front setback | ||
| Side setback | ||
| Total side setbacks | ||
| Rear setback | ||
| Building separation | ||
| Maximum height | ||
| Minimum height | ||
| Maximum lot coverage |
|
|
| Minimum parking | 0 spaces per unit TMC 19.07.100B.1.b |
4. ADU standards
Lot
No standards.
Building
No standards.
5. Dividing land
| Division | Approval | Lots | Density | Each new lot |
|---|---|---|---|---|
| Short subdivision TMC 13.05.070H Table H; 13.04.090A | A | 2 to 9 TMC 13.05.070H Table H; TMC 13.01.040 | — | Minimum lot size Not set TMC 19.09 Table 9-2 |
| Subdivision TMC 13.05.110B; 13.05.070H Table H | H | 10 or more TMC 13.01.040 | — | Minimum lot size Not set TMC 19.09 Table 9-2 |
| Binding site plan TMC 13.05.070H Table H; 13.04.088BOnly for: Multifamily as part of a mix-use development, Multifamily – stand alone | A | Minimum lots Not set TMC 13.04.088 |
— | Minimum lot size Not set TMC 13.04.088 |
✓ By right A Administrative review H Public hearing — Not allowed
Conditions
- All of these are true:
- The site is in an upland location (not over-water or in-water)
- The site is upland on the west side of the Foss Waterway, or on the east side south of the East 11th Street right of way, and not east of East D Street
- The use provides a significant public benefit with respect to the public access and restoration goals of the Shoreline Master Program
- Any of these is true:
- Navigability is severely limited at the proposed site
- The site is within shoreline jurisdiction but physically separated from the shoreline by a separate property, public right-of-way, or existing use
- All of these are true:
- The site is in an upland location (not over-water or in-water)
- The site is upland on the west side of the Foss Waterway, or on the east side south of the East 11th Street right of way, and not east of East D Street
- The use provides a significant public benefit with respect to the public access and restoration goals of the Shoreline Master Program
- Any of these is true:
- The use is part of a mixed-use proposal or facility that supports water-oriented uses
- Navigability is severely limited at the proposed site
- The site is within shoreline jurisdiction but physically separated from the shoreline by a separate property, public right-of-way, or existing use
- The building is adjacent to Dock Street or the esplanade
- All of these are true:
- The site is in an upland location (not over-water or in-water)
- The site is upland on the west side of the Foss Waterway, or on the east side south of the East 11th Street right of way, and not east of East D Street
- The building is adjacent to Dock Street or the esplanade
- The building includes water-oriented uses directly accessible from Dock Street or the esplanade
- The use provides a significant public benefit with respect to the public access and restoration goals of the Shoreline Master Program
- Any of these is true:
- The use is part of a mixed-use proposal or facility that supports water-oriented uses
- Navigability is severely limited at the proposed site
- The site is within shoreline jurisdiction but physically separated from the shoreline by a separate property, public right-of-way, or existing use
- All of these are true:
- The site is in an upland location (not over-water or in-water)
- The site is upland on the west side of the Foss Waterway, or on the east side south of the East 11th Street right of way, and not east of East D Street
- The building is adjacent to Dock Street or the esplanade
- At least 25 percent of the shoreline frontage is occupied by a water-oriented use
- The use provides a significant public benefit with respect to the public access and restoration goals of the Shoreline Master Program
- Any of these is true:
- The use is part of a mixed-use proposal or facility that supports water-oriented uses
- Navigability is severely limited at the proposed site
- The site is within shoreline jurisdiction but physically separated from the shoreline by a separate property, public right-of-way, or existing use
- The building includes water-oriented uses directly accessible from Dock Street or the esplanade
- All of these are true:
- The site is in an upland location (not over-water or in-water)
- The site is upland on the west side of the Foss Waterway, or on the east side south of the East 11th Street right of way, and not east of East D Street
- The building is adjacent to Dock Street or the esplanade
- The use provides a significant public benefit with respect to the public access and restoration goals of the Shoreline Master Program
- Any of these is true:
- The use is part of a mixed-use proposal or facility that supports water-oriented uses
- Navigability is severely limited at the proposed site
- The site is within shoreline jurisdiction but physically separated from the shoreline by a separate property, public right-of-way, or existing use
- The building includes water-oriented uses directly accessible from Dock Street or the esplanade
- At least 25 percent of the shoreline frontage is occupied by a water-oriented use
- Which S-8 Table 9-1 segment of the Thea Foss Waterway the site is in, or the east side is not east_side
- Which S-8 Table 9-1 segment of the Thea Foss Waterway the site is in, or the east side is east_side
- All of these are true:
- Which S-8 Table 9-1 segment of the Thea Foss Waterway the site is in, or the east side is east_side
- A critical area buffer is present on the site
- All of these are true:
- Which S-8 Table 9-1 segment of the Thea Foss Waterway the site is in, or the east side is east_side
- A critical area buffer is present on the site
- The project uses the S-8 Alternative 2 development option
- None of these is true:
- The project uses the S-8 Alternative 2 development option
- Which S-8 Table 9-1 segment of the Thea Foss Waterway the site is in, or the east side is north_end
- All of these are true:
- Which S-8 Table 9-1 segment of the Thea Foss Waterway the site is in, or the east side is site11_to_site10
- The project uses the S-8 Alternative 2 development option
- All of these are true:
- Which S-8 Table 9-1 segment of the Thea Foss Waterway the site is in, or the east side is site11_to_site10
- The project uses the S-8 Alternative 2 development option
- Which S-8 Table 9-1 segment of the Thea Foss Waterway the site is in, or the east side is site10_to_11th
- Which S-8 Table 9-1 segment of the Thea Foss Waterway the site is in, or the east side is 11th_to_15th
- Which S-8 Table 9-1 segment of the Thea Foss Waterway the site is in, or the east side is 15th_to_18th
- Which S-8 Table 9-1 segment of the Thea Foss Waterway the site is in, or the east side is 18th_to_south
- Which S-8 Table 9-1 segment of the Thea Foss Waterway the site is in, or the east side is one of north_end, site10_to_11th, 11th_to_15th
- Which S-8 Table 9-1 segment of the Thea Foss Waterway the site is in, or the east side is one of 15th_to_18th, 18th_to_south
- All of these are true:
- Which S-8 Table 9-1 segment of the Thea Foss Waterway the site is in, or the east side is not east_side
- The project uses the S-8 Alternative 2 development option
- All of these are true:
- Which S-8 Table 9-1 segment of the Thea Foss Waterway the site is in, or the east side is not east_side
- The project uses the S-8 Alternative 2 development option