Sign in

9805 31ST ST E, Puyallup, WA 98371

On MLS · $239,950 · 161 days · Redfin ↗

Lots near here →

17,576 sf · 100% outside sensitive areas

17,576 sf · 0.4 ac
Width ≈ 93 ft · Depth ≈ 185 ft
Outside sensitive areas about 17,600 sf
Width and depth are estimated.
County
Pierce County
Parcel ID
0420098084
Assessed land value
$238,300
Assessed building value
$0
Legal
Section 09 Township 20 Range 04 Quarter 44 L A OF SP 2020-09-02-5001 EASE OF REC OUT OF 04-20-09-8-061 SEG 2021-0140 JP 09/18/20 JP

Values are from the county assessor.

Jurisdiction
Edgewood
Zone
MR-2 · Mixed Residential 2 →

Your lot

Lot area
17,576 sf
Net area
17,576 sf (lot area minus wetland, flood, steep slope)
Frontage
93 ft
Lot width
≈ 93 ft (estimated)
Lot depth
≈ 185 ft (estimated)

✔ You can build (by right)

1 unit
Detached DwellingEMC 18.70.050
2 units
DuplexEMC 18.70.050
Stacked FlatsEMC 18.70.050
Cottage HousingEMC 18.70.050
Courtyard ApartmentsEMC 18.70.050
3 units
Multi-plex (tri-. four-. fixe-, six-)EMC 18.70.050
TownhouseEMC 18.70.050
4+ units
Multi-plex (tri-. four-. fixe-, six-), up to 5 unitsEMC 18.70.050
Only if: The project uses the inclusionary density bonus (on-site low-income and/or below market rate units)EMC 18.90.080(E)(2)
Townhouse, up to 5 unitsEMC 18.70.050
Only if: The project uses the inclusionary density bonus (on-site low-income and/or below market rate units)EMC 18.90.080(E)(2)
ADU
ADU with Detached DwellingEMC 18.70.050; 18.90.190(D)(2)

Dividing the lot

Subdivision, short
? Up to 4 lots, needs verification · administrative reviewEMC 16.03.050
How 4 lots are counted
✓ Lots: 4 ≤ 6 allowedEMC 16.03.020
✓ New lot area 4,394 sf ≥ 3,200 sf requiredEMC 18.80.050(C)(2)(a)(ii)
✓ Road frontage 93 ft ≥ 80 ft needed (4 lots × 20 ft)EMC 18.90.100(C)(1)
✓ Each new lot of 4,394 sf can hold a home
⚠ Needs to check:
  • New lot frontage 23 ft, one of these:
    ✗At least 50 ftEMC 18.80.050(C)(5)
    ✓At least 20 ft, if the lot is a flag lotEMC 18.90.100(C)(1)
Subdivision, full
✗ Cannot be divided into 7 lotsEMC 16.04.030(A)
✗ New lot area 2,511 sf < 3,200 sf required (short 689 sf)EMC 18.80.050(C)(2)(a)(ii)
✗ At most 4 lots face the road: 93 ft of frontage, 20 ft eachEMC 18.90.100(C)(1)
Residential cluster development
? Up to 5 lots, needs verification · public hearingEMC 18.50.035(B)(4)
How 5 lots are counted
✓ New lot area 3,515 sf ≥ 3,000 sf requiredEMC 18.50.035(C)(2)(b)
✓ Each new lot of 3,515 sf can hold a home
⚠ Needs to check:
  • Lot area: The maximum density of the underlying zoning district shall apply. Density is based on the net buildable area as prescribed in EMC § 18.90.040.EMC 18.50.035(C)(1)
Binding site plan
✗ Cannot be divided into 2 lotsEMC 16.05.050(B)
With these choices: up to 4 lots
· Division of land for the sale or lease of industrial or commercial propertyEMC 16.05.020; 16.05.050(B)
· Division of land that includes land to be created as condominium ownership under Chapter 64.34 RCWEMC 16.05.020; 16.05.050(B)
Binding site plan
✗ Cannot be divided into 2 lotsEMC 16.05.050(A)
With these choices: up to 5 lots
· Division of land for the sale or lease of industrial or commercial propertyEMC 16.05.020; 16.05.050(A)
· Division of land that includes land to be created as condominium ownership under Chapter 64.34 RCWEMC 16.05.020; 16.05.050(A)
✗ At least 5 lots requiredEMC 16.05.050(A)
✗ std.project.total_unitsEMC 16.05.020; 16.05.050(A)

Counted: only lots that face an existing road.
Not checked: lot shape, and whether the lot was divided in the last 5 years.

Frontage (lot edge within 50 ft of a road)
31st St Elocal road93 ft
Outside sensitive areas about 17,600 sf (wetland, flood, mapped stream buffer and slope 40% or more are taken off)
The largest rectangle that fits outside the sensitive areas. Setbacks and review areas are not taken off.
Easy to build: standard foundation, little grading.
Some extra cost: stepped foundation, steeper driveway.
Costly: retaining walls and an engineered foundation, often a geotech report.
Estimated from public maps. A site study and the permit review set the final area.

Source: USGS 3DEP bare-earth elevation (lidar), slope on a 3 m grid.
Check it on the WA DNR Lidar Portal ↗.

1. Soil on the lot

Foundation somewhat limited · Rain water very limited
Foundation somewhat limited · Rain water very limited

2. What it means for a house

Foundation
USDA soil rating for a house foundation · Soils A and B, 100% of the land outside sensitive areas
1
USDA rating
Not limitedSomewhat limitedVery limited

USDA rates every soil on 3 levels, from best to worst.

2
What "somewhat limited" means

The soil is fair for this use. The limits can be overcome or made smaller with special planning, design or building. Expect fair performance and some upkeep.

USDA text
"Somewhat limited" indicates that the soil has features that are moderately favorable for the specified use. The limitations can be overcome or minimized by special planning, design, or installation. Fair performance and moderate maintenance can be expected.
3
How USDA rates it

The use: A house of 3 stories or less, with no basement. It sits on concrete footings, about 2 ft deep.

The test: USDA checks soil features for this use, like flooding, ground water and slope. Each feature that limits the use gets a score from 0.01 to 1.00. The worst score sets the rating: 1.00 is very limited, a lower score is somewhat limited, no score is not limited.

USDA text
Dwellings are single-family houses of three stories or less. For dwellings without basements, the foundation is assumed to consist of spread footings of reinforced concrete built on undisturbed soil at a depth of 2 feet or at the depth of maximum frost penetration, whichever is deeper.
All features and their limits →
4
What USDA found here: 2 limiting features · worst 0.20 → somewhat limited
  • Depth to saturated zoneNo limitWorst0.20Ground water is close to the surface. The soil drains slowly and can get soggy in heavy rain.
    USDA text
    Soils with shallow depth to a water table maybe difficult to reclaim and revegetated. These areas are slow to drain and can become waterlogged and boggy during periods of heavy precipitation.
  • SlopeNo limitWorst0.16Steep ground makes it hard for heavy machines to work.
    USDA text
    Steep slopes impede trafficability of heavy machinery and reclamation of borrow sites.
Rain water
USDA soil rating for soaking up rain water · Soils A and B, 100% of the land outside sensitive areas
1
USDA rating
Not limitedSomewhat limitedVery limited

USDA rates every soil on 3 levels, from best to worst.

2
What "very limited" means

The soil has one or more features that are bad for this use. They usually cannot be fixed without major soil work, a special design, or costly building methods. Expect poor performance and high upkeep.

USDA text
"Very limited" indicates that the soil has one or more features that are unfavorable for the specified system. The limitations generally cannot be overcome without major soil reclamation, special design, or expensive installation procedures. Poor performance and high maintenance can be expected.
3
How USDA rates it

The use: A shallow system that lets rain water soak into the ground, like a rain garden, a swale or porous paving. It holds 1 inch of rain, and the water should soak in within 24 to 48 hours.

The test: USDA checks soil features for this use, like flooding, ground water and slope. Each feature that limits the use gets a score from 0.01 to 1.00. The worst score sets the rating: 1.00 is very limited, a lower score is somewhat limited, no score is not limited.

USDA text
Shallow Infiltration Systems are a set of Best Management Practices for stormwater management. These systems include pervious pavement, buffer strips, filter strips, and vegetated swales. … The fundamental function of these systems is to hold the runoff generated from an area during a one inch rainfall event. … The water should infiltrate into the surrounding soil in 24 to 48 hours.
All features and their limits →
4
What USDA found here: 4 limiting features · worst 1.00 → very limited
  • WetnessNo limitWorst1.00Ground water comes close to the surface in the wet season.
    USDA text
    Soils having a high seasonal water table are limited for shallow infiltration systems.
  • SlopeNo limitWorst0.47Sloping ground is harder for machines and needs a changed design. Added water can make the slope slide.
    USDA text
    Soils that are sloping are limited in terms of the stormwater management systems that can be installed. Sloping soils are more difficult to for equipment usage. excessive slope may also be a trigger for mass movement when additional water is added to a part of the landscape.
  • Vegetation establishmentNo limitWorst0.44After digging, plants are harder to grow back. Better topsoil or soil amendments may be needed.
    USDA text
    Material rated fair can be vegetated and stabilized by modifying one or more properties. Topdressing with better material or applications of soil amendments may be necessary for satisfactory performance.
  • Adsorptive capacityNo limitWorst0.20The soil under the system can hold back only a little of the harmful material in rain water. This reason can make the rating somewhat limited, never very limited.
    USDA text
    Soils having low adsorption lack the ability to attenuate potentially harmful material.

Source: USDA soil survey (SSURGO). It maps soil at about 1 inch = 1/4 mile, so a soil line can be off by 100 ft or more. For screening only.
USDA: "Onsite investigation may be needed to validate these interpretations and to confirm the identity of the soil on a given site."
Not checked: septic, liquefaction.

Needs a study
Land in or near a mapped landslide. The city or county may ask for a geotech report before a permit.
On the Edgewood mapmap ↗

Estimated from public maps. A site study and the permit review set the final area.
Source: city and county wetland maps and review areas, city and county stream maps and review areas, city and county habitat maps, city and county landslide maps, NWI wetlands, DNR streams, WDFW priority habitats, DNR landslides, FEMA 100-year flood zones, USGS 3DEP slope, USDA soil survey.
The map links show each public layer as it is. They can show rows we leave out, like filled wetlands or buffers.
Not checked: wetlands off the lot, stream buffers that the city or county does not map, habitats that WDFW does not show at their true place, landslides outside the areas that the DNR has studied. Not every city or county maps a review area, so a lot with none can still be in a wetland buffer.

Sewer

Inside UGA
yes
Nearest public main
not on our maps (within 500 ft)

Source: WA Urban Growth Areas; city, county and sewer district sewer maps.
The sewer maps have gaps. A main can be there but not on the map. The sewer district decides.

Water

Water system
MOUNTAIN VIEW-EDGEWOOD WATER CO
Phone
(253) 863-7348

Source: WA Department of Health service areas. The area shows who serves the lot, not where the pipe is. Ask the water system for the distance to the main and the cost.